January 2007
1-7
WorkCentre 7132
Cleaning Procedures, Final Actions
Service Call Procedures
Reversion 4.0
Cleaning Procedures
Purpose
To provide cleaning procedures to be performed at every service call.
Procedure
CAUTION
Do not use any solvents unless directed to do so by the Service Manual.
General Cleaning
Use a dry lint free cloth or a lint free cloth moistened with water for all cleaning unless directed
otherwise by the Service Manual. Wipe with a dry lint free cloth if a moistened cloth is used.
1.
Feed Components (Rolls and Pads)
Follow the General Cleaning procedure above.
2.
Toner Dispense Units
Vacuum the Toner Dispense units.
3.
Jam Sensors
Clean the sensors with a dry cotton swab.
4.
Scanner
a.
Switch off the power and allow the Exposure Lamp to cool off.
b.
Using the optical Cleaning Cloth, clean the front and rear of the Document Glass,
Document Cover, White Reference Strip, Reflector, and Mirror.
c.
Clean the Exposure Lamp with a clean cloth and Film Remover.
d.
Clean the Lens with Lens and Mirror Cleaner and lint free cloth.
5.
DADF
Check the paper path for debris or damage. Clean the rolls with a clean cloth and Film
Remover as required.
6.
Document Glass and Constant Velocity Transport Glass
Follow the General Cleaning procedure above.
7.
ROS Window
Remove and reinstall the ROS CLeaning Wand.
8.
IBT Belt
Check the Transfer Belt System and wipe with a dry lint free cloth. If the surface is exces-
sively dirty, replace the IBT Belt (PL 6.2)
NOTE: Do not rub the IBT CLeaning Blade. If it is necessary to clean the blade, use a soft
brush or dry swab to remove any contamination. Rubbing the blade will remove the pro-
tective coating.
9.
Finisher
Check the paper path for debris or damage. Clean the Finisher with a dry lint free cloth.
Final Actions
Purpose
To provide a guide for procedures to be done at the end of every service call.
Procedure
1.
Ensure that the exterior of the copier/printer and the adjacent area are clean. Use a dry
cloth or a cloth moistened with water to clean the copier/printer. Do not use solvents.
2.
Check the supply of consumables. Ensure that an adequate supply of consumables is
available according to local operating procedures.
3.
Complete the Service Log.
4.
Perform the following steps to make a copy of the Demonstration Original for the cus-
tomer:
a.
Load Tray 1 with 8.5 x 11 inch (A4) or 11 x 17 inch paper.
b.
Place the Color Test Pattern on the glass with the short edge of the test pattern reg-
istered to the left edge of the glass. Select Tray 1 and make a single copy.
c.
Print out the Machine Settings (Configuration Report). Store this report with the ser-
vice log in the Inner Cover.
d.
Ask the customer to verify the Print and Scan functions.
e.
Present the copies to the customer.
5.
Reconnect the machine to the customer network. Verify the function.
6.
Issue copy credits as needed.
7.
Discuss the service call with the customer to ensure that the customer understands what
has been done and is satisfied with the results of the service call.
Summary of Contents for WorkCentre 7132
Page 3: ...January 2007 ii WorkCentre 7132 Reversion 4 0 Introduction...
Page 9: ...January 2007 viii WorkCentre 7132 Reversion 4 0 Introduction Translated Warnings...
Page 17: ...January 2007 1 2 WorkCentre 7132 Reversion 4 0 Service Call Procedures...
Page 41: ...January 2007 2 18 WorkCentre 7132 Revision Status indicator raps...
Page 43: ...January 2007 2 20 WorkCentre 7132 002 770 Revision Status indicator raps...
Page 135: ...January 2007 2 112 WorkCentre 7132 005 943 Revision Status indicator raps...
Page 189: ...January 2007 2 166 WorkCentre 7132 012 905 012 923 Revision Status indicator raps...
Page 299: ...January 2007 2 276 WorkCentre 7132 016 983 016 985 Revision Status indicator raps...
Page 331: ...January 2007 2 298 WorkCentre 7132 018 797 Revision Status indicator raps...
Page 383: ...January 2007 2 350 WorkCentre 7132 024 985 Revision Status indicator raps...
Page 395: ...January 2007 2 362 WorkCentre 7132 025 596 025 597 Revision Status indicator raps...
Page 517: ...January 2007 2 484 WorkCentre 7132 034 796 Revision Status indicator raps...
Page 627: ...January 2007 2 594 WorkCentre 7132 042 400 Revision Status indicator raps...
Page 643: ...January 2007 2 610 WorkCentre 7132 061 344 061 345 Revision Status indicator raps...
Page 655: ...January 2007 2 622 WorkCentre 7132 062 790 Revision Status indicator raps...
Page 659: ...January 2007 2 626 WorkCentre 7132 063 500 Revision Status indicator raps...
Page 673: ...January 2007 2 640 WorkCentre 7132 071 940 Revision Status indicator raps...
Page 685: ...January 2007 2 652 WorkCentre 7132 072 940 Revision Status indicator raps...
Page 701: ...January 2007 2 668 WorkCentre 7132 075 402 Revision Status indicator raps...
Page 725: ...January 2007 2 692 WorkCentre 7132 077 968 Revision Status indicator raps...
Page 731: ...January 2007 2 698 WorkCentre 7132 078 941 Revision Status indicator raps...
Page 733: ...January 2007 2 700 WorkCentre 7132 081 799 Revision Status indicator raps...
Page 737: ...January 2007 2 704 WorkCentre 7132 089 632 089 633 Revision Status indicator raps...
Page 771: ...January 2007 2 738 WorkCentre 7132 094 421 094 422 Revision Status indicator raps...
Page 829: ...January 2007 2 796 WorkCentre 7132 116 790 Revision Status indicator raps...
Page 865: ...January 2007 2 832 WorkCentre 7132 123 399 123 400 Revision Status indicator raps...
Page 891: ...January 2007 2 858 WorkCentre 7132 125 311 Revision Status indicator raps...
Page 907: ...January 2007 2 874 WorkCentre 7132 134 210 134 211 Revision Status indicator raps...
Page 909: ...January 2007 2 876 WorkCentre 7132 202 399 Revision Status indicator raps...
Page 917: ...January 2007 3 2 WorkCentre 7132 Reversion 4 0 Image Quality...
Page 1003: ...January 2007 4 52 WorkCentre 7132 REP 5 1 1 Reversion 4 0 Repairs Adjustments...
Page 1005: ...January 2007 4 54 WorkCentre 7132 REP 6 1 1 Reversion 4 0 Repairs Adjustments...
Page 1021: ...May 2006 4 70 WorkCentre 7132 REP 9 2 5 Launch Version 3 0 Repairs Adjustments...
Page 1061: ...January 2007 4 110 WorkCentre 7132 REP 12 6 1 Reversion 4 0 Repairs Adjustments...
Page 1073: ...January 2007 4 122 WorkCentre 7132 REP 13 8 1 Reversion 4 0 Repairs Adjustments...
Page 1189: ...January 2007 4 238 WorkCentre 7132 ADJ 7 1 1 Reversion 4 0 Repairs Adjustments...
Page 1322: ...January 2007 5 99 WorkCentre 7132 Common Hardware Parts list Reversion 4 0...
Page 1323: ...January 2007 5 100 WorkCentre 7132 Common Hardware Reversion 4 0 Parts list...
Page 1325: ...January 2007 6 2 WorkCentre 7132 Reversion 4 0 General procedures information...
Page 1331: ...January 2007 6 8 WorkCentre 7132 NVM Read Write Reversion 4 0 General procedures information...
Page 1397: ...January 2007 6 74 WorkCentre 7132 IOT NVM List Reversion 4 0 General procedures information...
Page 1557: ...January 2007 7 2 WorkCentre 7132 Reversion 4 0 Wiring data...
Page 1589: ...January 2007 7 34 WorkCentre 7132 Plug Jack Locations Reversion 4 0 Wiring data...
Page 1593: ...January 2007 7 38 WorkCentre 7132 7 1 2 Reversion 4 0 Wiring data...
Page 1725: ...January 2007 8 2 WorkCentre 7132 Reversion 4 0 Options and Accessories...