January 2007
6-214
WorkCentre 7132
GP 13
Reversion 4.0
General procedures information
GP 14 Setup and Scan to PWS
Procedure
This procedure is intended to provide instructions for setting up the PWS and WC 7132 to
enable scanning to the PWS. Once the PWS is configured, it can be used as a tool to confirm
that a WC 7132 can scan and deliver a file via a network connection. Future attempts to verify
scanning to the PWS can be done by configuring the PWS to Obtain an IP Address Automat-
ically. Then simply enter the Scan folder name, User name, and Password into the WC 7132
as described in the following procedures (Preparing the WC 7132).
The first part of this procedure provides instructions to configure the PWS. For the PWS to
accept scanned files from the machine, it must be configured with an authorized user account
that the machine will use to log in with. The PWS also needs a shared folder that will be used
as a target location to copy the file into.
Preparing the PWS
Select the PWS Network Settings;
1.
Select Start/Settings/Network Connections/Local Area Connections.
2.
Access Properties. Scroll down and select Internet Protocol (TCPIP).
3.
Select Properties and then select Obtain an IP Address Automatically.
4.
Click on the Advanced button. Select the WINS tab.
5.
Select Default inside the NetBIOS setting area of the window.
6.
Select OK twice and Close to exit the windows.
Create a User Account for Scanning;
1.
Right-Click My Computer on the PWS desktop and select Manage.
2.
Select Local Users and Groups and then double-click the Users folder.
3.
Select the Action menu item and select New User (Figure 1).
Figure 1 (new user)
4.
Enter a new User Name and Password in the appropriate fields.
•
You can put a statement such as Password is ……. in the Description field to
remind you if you forget the password some day. The password is case sensitive so
be accurate.
5.
Uncheck User must change password at next logon.
6.
Select Password Never Expires.
7.
Select Create, then Close.
8.
The new user will be displayed in the list – Close the Computer Management window.
Create and configure the Shared folder on the PWS;
1.
Create a new folder on your C:/ drive (Named Scan in these examples).
2.
Right-click the new folder and select Sharing and Security from the menu.
3.
Compare the next two illustrations with the screen displayed on your PWS. Use the
instructions associated with the screen that matches your PWS.
If you see Figure 2;
•
Select Share the folder on the network and Allow network users to change my
files.
Summary of Contents for WorkCentre 7132
Page 3: ...January 2007 ii WorkCentre 7132 Reversion 4 0 Introduction...
Page 9: ...January 2007 viii WorkCentre 7132 Reversion 4 0 Introduction Translated Warnings...
Page 17: ...January 2007 1 2 WorkCentre 7132 Reversion 4 0 Service Call Procedures...
Page 41: ...January 2007 2 18 WorkCentre 7132 Revision Status indicator raps...
Page 43: ...January 2007 2 20 WorkCentre 7132 002 770 Revision Status indicator raps...
Page 135: ...January 2007 2 112 WorkCentre 7132 005 943 Revision Status indicator raps...
Page 189: ...January 2007 2 166 WorkCentre 7132 012 905 012 923 Revision Status indicator raps...
Page 299: ...January 2007 2 276 WorkCentre 7132 016 983 016 985 Revision Status indicator raps...
Page 331: ...January 2007 2 298 WorkCentre 7132 018 797 Revision Status indicator raps...
Page 383: ...January 2007 2 350 WorkCentre 7132 024 985 Revision Status indicator raps...
Page 395: ...January 2007 2 362 WorkCentre 7132 025 596 025 597 Revision Status indicator raps...
Page 517: ...January 2007 2 484 WorkCentre 7132 034 796 Revision Status indicator raps...
Page 627: ...January 2007 2 594 WorkCentre 7132 042 400 Revision Status indicator raps...
Page 643: ...January 2007 2 610 WorkCentre 7132 061 344 061 345 Revision Status indicator raps...
Page 655: ...January 2007 2 622 WorkCentre 7132 062 790 Revision Status indicator raps...
Page 659: ...January 2007 2 626 WorkCentre 7132 063 500 Revision Status indicator raps...
Page 673: ...January 2007 2 640 WorkCentre 7132 071 940 Revision Status indicator raps...
Page 685: ...January 2007 2 652 WorkCentre 7132 072 940 Revision Status indicator raps...
Page 701: ...January 2007 2 668 WorkCentre 7132 075 402 Revision Status indicator raps...
Page 725: ...January 2007 2 692 WorkCentre 7132 077 968 Revision Status indicator raps...
Page 731: ...January 2007 2 698 WorkCentre 7132 078 941 Revision Status indicator raps...
Page 733: ...January 2007 2 700 WorkCentre 7132 081 799 Revision Status indicator raps...
Page 737: ...January 2007 2 704 WorkCentre 7132 089 632 089 633 Revision Status indicator raps...
Page 771: ...January 2007 2 738 WorkCentre 7132 094 421 094 422 Revision Status indicator raps...
Page 829: ...January 2007 2 796 WorkCentre 7132 116 790 Revision Status indicator raps...
Page 865: ...January 2007 2 832 WorkCentre 7132 123 399 123 400 Revision Status indicator raps...
Page 891: ...January 2007 2 858 WorkCentre 7132 125 311 Revision Status indicator raps...
Page 907: ...January 2007 2 874 WorkCentre 7132 134 210 134 211 Revision Status indicator raps...
Page 909: ...January 2007 2 876 WorkCentre 7132 202 399 Revision Status indicator raps...
Page 917: ...January 2007 3 2 WorkCentre 7132 Reversion 4 0 Image Quality...
Page 1003: ...January 2007 4 52 WorkCentre 7132 REP 5 1 1 Reversion 4 0 Repairs Adjustments...
Page 1005: ...January 2007 4 54 WorkCentre 7132 REP 6 1 1 Reversion 4 0 Repairs Adjustments...
Page 1021: ...May 2006 4 70 WorkCentre 7132 REP 9 2 5 Launch Version 3 0 Repairs Adjustments...
Page 1061: ...January 2007 4 110 WorkCentre 7132 REP 12 6 1 Reversion 4 0 Repairs Adjustments...
Page 1073: ...January 2007 4 122 WorkCentre 7132 REP 13 8 1 Reversion 4 0 Repairs Adjustments...
Page 1189: ...January 2007 4 238 WorkCentre 7132 ADJ 7 1 1 Reversion 4 0 Repairs Adjustments...
Page 1322: ...January 2007 5 99 WorkCentre 7132 Common Hardware Parts list Reversion 4 0...
Page 1323: ...January 2007 5 100 WorkCentre 7132 Common Hardware Reversion 4 0 Parts list...
Page 1325: ...January 2007 6 2 WorkCentre 7132 Reversion 4 0 General procedures information...
Page 1331: ...January 2007 6 8 WorkCentre 7132 NVM Read Write Reversion 4 0 General procedures information...
Page 1397: ...January 2007 6 74 WorkCentre 7132 IOT NVM List Reversion 4 0 General procedures information...
Page 1557: ...January 2007 7 2 WorkCentre 7132 Reversion 4 0 Wiring data...
Page 1589: ...January 2007 7 34 WorkCentre 7132 Plug Jack Locations Reversion 4 0 Wiring data...
Page 1593: ...January 2007 7 38 WorkCentre 7132 7 1 2 Reversion 4 0 Wiring data...
Page 1725: ...January 2007 8 2 WorkCentre 7132 Reversion 4 0 Options and Accessories...