![Xerox Versant 80 Press Installation Manual Download Page 56](http://html.mh-extra.com/html/xerox/versant-80-press/versant-80-press_installation-manual_884109056.webp)
Versant 80 Press
Customer Expectation & Installation Guide
If this is a Xerox press and print server installation, is a functional network connection installed?
Yes
No
If No: When is the network connection scheduled to be installed?
_______________________________________________________________________________________________________
Is the date prior to machine installation?
Yes
No
Do the site space requirements meet installation planning requirements?
Yes
No
If No: What steps are being taken to ensure they meet installation planning requirements?
_______________________________________________________________________________________________________
Is the date prior to machine installation?
Yes
No
Site Preparation Checklist
The following checklist provides a list of tasks that the customer and the Xerox/Partner personnel should complete in order to
ensure a successful installation. When both the customer and Xerox/Partner tasks are completed, the Xerox/Partner personnel
should send notification to the carrier. This informs the carrier to plan for the delivery of the machine and to accomplish the
rigger installation.
Responsibility
(Enter the name of the person
responsible in the area marked with
the *)
Activity:
Delivery route
Customer
Xerox/ Partner
Date Completed
Determine if the route between the delivery door/loading dock
and the installation site meets all requirements for a successful
delivery; includes: Entrance ways, doorways, passageways,
turning radii, ramps, and elevators
X
Activity:
Location
Customer
Xerox/ Partner
Date Completed
Create an installation site sketch using the correct template:
Match the customer configuration (including possible future
expansion)
X
Determine the location of the system at the installation site
by using the site installation sketch
X
Activity:
Electrical
Customer
Xerox/ Partner
Date Completed
Ensure all electrical receptacles are installed at the site in
accordance with local codes
X
Activity:
Location
Customer
Xerox / Partner
Date Completed
Order network cables and install internet connection
X
Complete the network installation work sheets
X X