Preparing for installation
4-6
Installation Planning Guide
-3
•
Schedule hardware delivery.
•
Prepare the site:
–
Provide a table with adequate
space for hardware and
cables.
–
Ensure and install proper
electrical receptacles.
–
Obtain and string bus and tag
cables (must be fully
populated), if needed.
–
Install network to system
location.
–
Install Token Ring to system
location (if appropriate).
–
Install Ethernet to system
location (if appropriate).
–
Establish network addresses
and logical unit names for print
server and user workstations.
–
Complete preinstallation
checklist.
–
Provide table with adequate
space for hardware and
cables.
–
Ensure and install proper
electrical receptacles.
–
Ensure proper operating
environment.
–
Generate the host for an AFP1
device and IPL, as required.
–
Provide analog phone line
access for optional Sixth
Sense installation.
Sales rep
Chapters 4 to 6
Customer and
Xerox
Customer
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
_________
-2
•
Inspect and approve site.
•
Order consumable supplies.
•
Minimum supplies needed for
installation:
–
Paper (2 cartons)
–
Developer (1 carton)
–
Fuser agent (2 cartons)
–
Dry ink for DocuColor 2060
NPS/IPS (1 carton black)
After installation, you will need to
establish a procedure for ordering
supplies according to your ongoing
production requirements.
Chapter 4,
Appendix A and
sales rep
Xerox
Customer and
Xerox
_________
_________
Table 4-1. DocuColor 2060 NPS/IPS installation planning checklist (Continued)
Week
Activity
Reference
Responsibility
Date
completed
Summary of Contents for DocuColor 2060
Page 1: ...Xerox DocuColor 2060 NPS IPS Installation Planning Guide 721P90520 Version 8 0 October 2002 ...
Page 8: ...Table of contents viii Installation Planning Guide ...
Page 16: ...Safety xvi Installation Planning Guide ...
Page 20: ...Introduction xx Installation Planning Guide ...
Page 34: ...System overview 1 14 Installation Planning Guide ...
Page 42: ...Controller components and options 2 8 Installation Planning Guide ...
Page 62: ...Printer components and options 3 20 Installation Planning Guide ...
Page 78: ...Preparing for installation 4 16 Installation Planning Guide ...
Page 86: ...Controller specifications and requirements 5 8 Installation Planning Guide ...
Page 106: ...Printer specifications and requirements 6 20 Installation Planning Guide ...
Page 110: ...System connections 7 4 Installation Planning Guide ...
Page 162: ...Defining the channel attached printer to the host E 8 Installation Planning Guide ...