20 Copyright | C6EU SERIES Installation and Operation Manual, Version 1.6
The height of the foundation is determined by the terrain of the site. Depending on
rainfall and drainage a height between 15 cm and 30 cm above the ground is
recommended by XCHARGE.
Because of frost-proof the foundation has to be about 80 cm deep under the ground.
Notes:
•
laying of power cables should be carried out in accordance with relevant national
and industrial standards and specifications, as well as construction quality, process
and technical standards;
•
Cable selection specification shall be selected according to the type, power, voltage
and current level of the equipment and the number of equipment installed;
•
When cables are laid, they are strictly forbidden to be exposed. According to the
different environments and installation locations, cable bridges, line pipes and
directly buried modes are used for laying;
•
When the cables are directly buried, the depth of burying shall not be less than
0.8m because of the frost-proof;
•
When plastic pipes are used for power distribution, flame-retardant type and wall
thickness >2.0mm shall be adopted. When the steel pipe is used for underground
pipe wiring, the wall thickness is >2.5mm and anticorrosive treatment is carried
out;
•
The selection of power cable specifications should be selected according to the
installation environment and fire requirements.
Figure 4.3.2 Sketch of the foundation layers
Foundation
Ground
PVC Pipe