![wtw Turb 550 Operating Manual Download Page 39](http://html1.mh-extra.com/html/wtw/turb-550/turb-550_operating-manual_1000700039.webp)
Maintenance, cleaning, disposal
39
7 Remove the underside of the housing and lay it to
one side
8 Remove the two old batteries (1) and dispose of them
(see 5.3 D
ISPOSAL
)
9 Insert two new batteries (CR3032 lithium batteries)
so that the positive poles point towards the clip of the
battery holder
10 Reattach the underside of the housing and guide the
plug-in connector for the lamp module through the
opening on the side. Tighten up the five screws again
11 Insert the card with the short instructions
12 Erect the instrument again
13 Attach the lamp module and insert it again (see 5.1.1
C
HANGING
THE
LAMP
MODULE
)
14 Switch on the instrument
1
Summary of Contents for Turb 550
Page 8: ...Overview 8...
Page 12: ...Safety 12...
Page 16: ...Commissioning 16...
Page 25: ...Operation 25 Note The flow through vessel can remain installed until the next calibration...
Page 42: ...Maintenance cleaning disposal 42...
Page 46: ...What to do if 46...
Page 50: ...Accessories options 50...
Page 54: ...Abbreviations and index 54...