![wtw Turb 550 Operating Manual Download Page 30](http://html1.mh-extra.com/html/wtw/turb-550/turb-550_operating-manual_1000700030.webp)
Operation
30
the immediate vicinity of the calibration point.
l
For a 2 point calibration, you must use 2 calibration stan-
dards next to each other. Measuring is then possible with
a reduced accuracy between the calibration points.
l
To achieve the precision specified in the technical data,
you must perform the calibration using all 3 calibration
standards in the specified sequence.
If the print function is switched on and a printer or PC is con-
nected and switched on, the following printout or display is
output:
DATE:
15 JAN 1999
13:20
Current date
and time
LAST CAL:
17 DEC 1998
17:03
Date and time
of the last ca-
libration
CALIBRATION INTERVAL:
30 DAYS
Calibration in-
terval: 30
days
CALIBRATION POINTS:
Calibration
points
STANDARD
DATE
TIME
0.02 NTU
15 JAN 1999
13:20
Calibration
standard
used with
date and time
10.0 NTU
15 JAN 1999
13:20
1000 NTU
15 JAN 1999
13:19
30 DAYS UNTIL NEXT CALIBRATION
30 days until
the next cali-
bration
Sample printout
Summary of Contents for Turb 550
Page 8: ...Overview 8...
Page 12: ...Safety 12...
Page 16: ...Commissioning 16...
Page 25: ...Operation 25 Note The flow through vessel can remain installed until the next calibration...
Page 42: ...Maintenance cleaning disposal 42...
Page 46: ...What to do if 46...
Page 50: ...Accessories options 50...
Page 54: ...Abbreviations and index 54...