![wtw Turb 550 Operating Manual Download Page 15](http://html1.mh-extra.com/html/wtw/turb-550/turb-550_operating-manual_1000700015.webp)
Commissioning
15
3.3
Switching on the measuring instrument
Sample display
Note
Even if it is not measuring, always leave a cell plugged into
the instrument so that the cell shaft is protected against
dust.
1 Place the measuring instrument on a flat surface and
protect it against intensive light and heat
2 Press the
key.
All the display elements appear briefly on the display.
The measuring instrument then switches automati-
cally to the measuring mode: A measured value and
the Auto display appear
3 Set the date and time, if necessary (see 4.4.1 C
HAN
-
GING
SETTINGS
)
4 The measuring instrument has a warm-up period of
at least 30 minutes. After this time, the measuring in-
strument measures with the specified accuracy.
Summary of Contents for Turb 550
Page 8: ...Overview 8...
Page 12: ...Safety 12...
Page 16: ...Commissioning 16...
Page 25: ...Operation 25 Note The flow through vessel can remain installed until the next calibration...
Page 42: ...Maintenance cleaning disposal 42...
Page 46: ...What to do if 46...
Page 50: ...Accessories options 50...
Page 54: ...Abbreviations and index 54...