![wtw Turb 550 Operating Manual Download Page 32](http://html1.mh-extra.com/html/wtw/turb-550/turb-550_operating-manual_1000700032.webp)
Operation
32
2 To change the year, press
or
3 Confirm by pressing
. The instrument automati-
cally shows the next possible setting, the date. The
Day.Month message appears and the number of the
month flashes
4 To change the month, press
or
and confirm by
pressing .
The number of the day flashes
5 To change the day, press
or
and confirm by
pressing
. The Time display appears
6 Set the time (minutes and seconds) with
or
and
confirm by pressing
. The Int (calibration inter-
val) message appears
Summary of Contents for Turb 550
Page 8: ...Overview 8...
Page 12: ...Safety 12...
Page 16: ...Commissioning 16...
Page 25: ...Operation 25 Note The flow through vessel can remain installed until the next calibration...
Page 42: ...Maintenance cleaning disposal 42...
Page 46: ...What to do if 46...
Page 50: ...Accessories options 50...
Page 54: ...Abbreviations and index 54...