Installation
System 182
3 - 22
ba75503e07
04/2012
3.5.3
Panel mounting
Materials required
PMS/IQ kit for panel mounting (see chapter 11 A
).
Tools
3 mm set screw wrench (contained in the panel installation kit).
Switch panel aperture
Fig. 3-19 Mounting aperture in the switch panel (dimensions in mm)
Note
The space required on the panel for the Universal Transmitter is given
in the dimension drawings in section 10.5.
138
138
34.5
47
11
11
4
Maximum thickness
3 mm
Summary of Contents for DIQ/S 182-PR
Page 6: ...Contents System 182 0 4 ba75503e07 04 2012 ...
Page 10: ...Overview System 182 1 4 ba75503e07 04 2012 ...
Page 14: ...Safety instructions System 182 2 4 ba75503e07 04 2012 ...
Page 78: ...Operation System 182 4 18 ba75503e07 04 2012 ...
Page 84: ...The SETTINGS menu System 182 5 6 ba75503e07 04 2012 ...
Page 110: ...Relay outputs System 182 6 26 ba75503e07 04 2012 ...
Page 122: ...PROFIBUS connection System 182 7 12 ba75503e07 04 2012 ...
Page 124: ...Maintenance and cleaning System 182 8 2 ba75503e07 04 2012 ...
Page 130: ...What to do if System 182 9 6 ba75503e07 04 2012 ...
Page 142: ...Accessories and options System 182 11 2 ba75503e07 04 2012 ...
Page 146: ...Appendix store separately if required System 182 13 2 ba75503e07 04 2012 ...