Commissioning
Cond 7310
10
ba75933e04
06/2013
3
Commissioning
3.1
Scope of delivery
Conductivity meter Cond 7310
4 batteries 1.5 V Mignon type AA
Power pack
USB cable
Stand
Stand holder
Comprehensive operating manual
Short instructions
CD-ROM with
– USB drivers
– comprehensive operating manual
– software MultiLab Importer
3.2
Power supply
The Cond 7310 is supplied with power in the following ways:
Mains operation with the supplied power pack.
Battery operation (4 x alkaline manganese batteries, type AA)
USB operation via a connected USB-B cable.
3.3
Initial commissioning
Perform the following activities:
Insert the supplied batteries
For mains operation: Connect the power pack
If necessary, mount the stand
Switch on the meter (see section 4.2 S
Set the date and time (see section 4.4.5 E
Summary of Contents for Cond 7310
Page 58: ...Index Cond 7310 58 ba75933e04 06 2013...
Page 59: ......