5
NOTE:
1. Place the assembled unit on the North-facing slope of the roof for use in the Southern
Hemisphere.
2. Ensure tank is parallel with the ground, and inlet/outlet pipes vertical. (refer to table below for
details)
3. Attach system securely to the roof either by 6 mm steel wires or if ground mounted, the frame
fastened to metal attachment points (not supplied) encased in cement blocks. (dimensions of each
block 100×100×h (h
≥
50) mm). Both methods should be used in areas of high wind.
4. Connect inlet/outlet pipes to internal plumbing.
5. Insulate all external pipes and wrap in insulating foil.
Fig. 3 Unit mounted on the roof ridge
Summary of Contents for JR-138
Page 10: ...10 Trouble Shooting...