background image

 

6

Glass Tube Assembly 

 

Evacuated Tubes Assembly 
 

1 Seal 
2 Connections 

3 Heat pipe 
4 Black rubber seal 

5 Aluminium fin 

 

 

 

1. Place the o rings into the recess on the copper heat pipes at the end with the large bulb. 
2. Fit a black rubber wind-blocking seal to the open end of the glass tubes and take note of which 

end should slide into the recess in the tank. It will be easier to do this if the tube is moistened for 
lubrication. Slide the seal 10 cm down the tube. 

3. Slide the threaded brass securing bush over the bottom of the heat pipe, insert the long thin end 
of the heat pipe into the aluminium fin already in the evacuated tube, leaving enough of the heat 

pipe exposed to allow insertion of the heat pipe into the tank and for fastening of the threaded 
brass securing bush. 

4. Insert the heat pipe into the locating hole in the tank, and tighten up the brass locating bush of 
the heat pipe into the recess in the tank with enough pressure to effect a seal, but do not over 

tighten. 
5. Push the glass tube into the locating hole in the tank; do not twist the tube to avoid damaging the 

inner cover of the tube. 

 

 

 

6. Insert the tubes end into the end protector, and then clip the protector first into the shorter holes 
in the tube carriage, and then the left/right flexible fasteners into the longer holes in the tube 

carriage. 
 

Summary of Contents for JR-138

Page 1: ...iple of Operation 3 Assembly Instructions 3 Reflector Assembly 3 Frame Assembly 3 Connecting frame and reflector 4 Storage tank assembly 4 Unit Mounting Instructions 4 Mounting on roof ridge 4 Mountin...

Page 2: ...diance days The ESWH is available in several sizes depending on your hot water requirements Fig 1 Structure of ESWH 1 Insulation polyurethane foam 2 Inner cylinder AISI 316L 3 Outer shell galvanized s...

Page 3: ...f ESWH heater can be chosen between 30 or 45 Reflector Assembly 1 Place the module type reflectors side by side 2 Position the base bracket with larger parallel slots at the bottom Overlap the holes w...

Page 4: ...ent into place NOTE Leave the nuts loose as some alignment adjustment may be necessary after fitting tubes Unit Mounting Instructions Mounting on the roof ridge The assembled unit should be placed on...

Page 5: ...ils 3 Attach system securely to the roof either by 6 mm steel wires or if ground mounted the frame fastened to metal attachment points not supplied encased in cement blocks dimensions of each block 10...

Page 6: ...of the heat pipe into the aluminium fin already in the evacuated tube leaving enough of the heat pipe exposed to allow insertion of the heat pipe into the tank and for fastening of the threaded brass...

Page 7: ...es are covered the heat pipes can get hot enough to cause a burn injury and damage to the heat pipes will occur if the hot end of the pipe contacts cold water Only uncover the glass tubes once the tan...

Page 8: ...able temperature before showering or bathing 2 JB series solar water heater withstands pressure 0 5 kgf cm 3 The evacuated tubes resist temperatures as low as 70 when the tank is empty Under these con...

Page 9: ...y does hot water flow intermittently some times When the outflow rate is greater than the inflow the relief valve on the top of tank will open and suck air in the water level inside the tank will then...

Page 10: ...10 Trouble Shooting...

Reviews: