G-18
RCK54/60-24B-EC · RCK60-27B-EC · RC60-24/27BR, WSM
G GENERAL
Setting Mower
1. Turn the steering wheel fully left.
2. Install the mower from right side of the tractor.
3. Roll the mower under the tractor, and then return the steering
wheel.
W1030314
Mounting Universal Joint Rear Link
1. Pull back the coupler (1) of the universal joint.
2. Push the universal joint (3) onto the mid-PTO shaft, and release
the coupler (1).
3. Slide the universal joint back and forward to make sure the
universal joint is locked securely.
4. Lower the rear links.
5. Attach the rear links (4) to the mower deck, pulling the L-pins (2).
W1030772
Mounting Front Link
1. Push down the link fixing lever, pulling the L-pin.
2. Hook the front link (2) to the level fulcrum, and turn the link fixing
lever (1).
3. Return the L-pin (3).
NOTE
■
• Make sure the link fixing lever (1) is fixed with L-pin (3)
securely.
IMPORTANT
■
• After mounted the mower, be sure to check the mower deck
and tractor body are not interference.
W1031053
Hydraulic Pipe Fitting
(RCK54-24B-EC, RCK60-24B-EC, RC60-24BR)
1. Loosen the screw (1) and pull up the hydraulic pipe (2) on
underside of machine, then retighten the screw (1) to keep the
gear box of mower and the hydraulic pipe (2) out of contact.
2. Operate the hydraulic control lever rearward to rise the highest
position.
3. Make sure that the gear box of mower and hydraulic pipe (2) do
not contact.
W1018237
(1) Coupler
(2) L-Pin
(3) Universal Joint
(4) Rear Link
(1) Link Fixing Lever
(2) Front Link
(3) L-pin
(1) Screw
(2) Hydraulic Pipe
KiSC issued 11, 2006 A