![Workhorse Powerhouse Quartz 2608 Owner'S Manual Download Page 13](http://html1.mh-extra.com/html/workhorse/powerhouse-quartz-2608/powerhouse-quartz-2608_owners-manual_997067013.webp)
Assembly
3730 E. Southern Avenue, Phoenix, AZ 85040 USA
800-778-8779
Workhorseproducts.com
13
Step 5: Installing the belt.
Parts needed:
Belt
Threading Pin
1. Thread the belt over the top of the outfeed roller and
over the upper cross brace. After the belt has gone
through the chamber, pull the belt to hang over the
infeed roller to add weight to help with the threading of
the lower portion.
2. On the outfeed side, take the other end of the belt and
thread it under the outfeed roller and under the lower cross
brace, through the lower slot on the roller/rail assembly.
Guide the belt through the oven chamber so it continues
through the lower slot and over the lower cross brace.
3. Thread the belt until both ends
meet on the infeed roller.
4. To install the belt it may be required
to adjust the belt tracking. This is done
by turning the tension bolt clockwise
(to tighten) or counterclockwise (to
loosen). Belt tracking will be explained
more in-depth on page 13.
5. Align the belt closure until the teeth
mesh connect, and install the threading
pin into the teeth. Hold together the
teeth while installing the pin. When it’s
fully inserted and the belt is fully in-
stalled, trim any extra pin that may be
jutting from the sides.