6 720 610 576 GB (03.02)
Commissioning
23
5
Commissioning
Fig. 30
8.1
Pressure gauge
15
Safety valve
27
Automatic vent
61
Reset button
135
Master switch
136
Temperature control for central heating
170
Service cocks on CH flow and return
171
Hot water
172
Gas cock (shown in on position)
173
Cold water service cock
295
Appliance type sticker
310
Temperature control for hot water
317
Multifunction display
358
Condensate trap
363
Indicator lamp for burner
364
Indicator lamp for power supply
365
“Chimney sweep” button
366
Service button
367
ECO button
5.1
Commissioning
Benchmark Water Treatment: For optimum perform-
ance after installation, this boiler and its associated cen-
tral heating system should be flushed in accordance
with the guidelines given in BS7593:1992 - Treatment
of water in domestic hot water systems. Full instruc-
tions are supplied with proprietary cleansers sold for
this purpose. If an inhibitor is to be used after flushing,
it should be used in accordance with the inhibitor man-
ufacturers instructions.
To drain the appliance shut the system valves and open
the system drain point.
Suitable flushing agents and inhibitors are available
from Betz/Dearborn Tel.: 0151 4209563 and Fernox
Tel.: 01799 550811. Instructions for use are supplied
with the these products.
365
61
317 366 367
ECO
364
135
295
136
170
171
E
6 720 610 576-07.2O
15
310
363
358
8.1
173
170
172
27
Never run the appliance when empty or
unpressurised.
i
The operational CO
2
level is set at the fac-
tory and no adjustment is necessary when
installing a natural gas fired appliance.
Summary of Contents for GREENSTAR HE combi Series
Page 174: ...7 181 465 347 01 07 50 Appendix...
Page 175: ...7 181 465 347 01 07 Appendix 51...
Page 176: ...Appendix...