INSTALLATION
Greenstar FS CDi
ErP
6720818079 (2016/04)
22
Fig. 23 Condensate connection
(See Pre-Installation section for condensate pipe work running from the
adaptor [11] to the discharge outlet).
Never terminate or discharge into any open source, including; sink,
bath, shower, bidet, toilet etc.
GAS AND WATER CONNECTIONS:
▶ Remove the transit bung [12] from the gas and water connections
[A, B & C] on the boiler and mounting frame.
▶ Ensure the area is clear of debris and manoeuvre the boiler rear
wheels onto the outer rails of the mounting frame [6].
▶ Take care when moving the boiler to position the front wheels onto
the rails and align the gas/water connections and the flue.
▶ Secure boiler to mounting frame [6] with screw [13]
▶ Place the two larger valve sealing washers (shown shaded) onto
valves [A] & [C].
▶ Place the bonded sealing washer onto valve [B].
▶ Ensure all pipe work is clean.
▶ Tighten the compression fittings to secure:
[A] - CH flow (28mm)
[B] - Gas inlet (22mm)
[C] - CH return (28mm)
Fig. 24 Connections
▶ Any external condensate pipe work should be
protected with weather resistant insulation to help
prevent freezing.
▶ The flexible pipe supplied can only be used inside the
property.
CAUTION:
ISOLATE THE MAINS GAS AND WATER
SUPPLY BEFORE STARTING ANY WORK AND OBSERVE
ALL RELEVANT SAFETY PRECAUTIONS.
Surplus water may be present due to factory testing.
Max. 4500mm
Min. 200mm
6720648665-39.1Wo
8 10
11
8
6
A
B
C
13
7
12
6720818079-02.1Wo