![Wood-mizer SlabMizer MB200 Operation Manual Download Page 21](http://html1.mh-extra.com/html/wood-mizer/slabmizer-mb200/slabmizer-mb200_operation-manual_994588021.webp)
Electrical Lockout Procedures
2
2-8
WMdoc082019
4.
Remove the lockout devices and re-energize the machine or equipment.
NOTE:
The removal of some forms of blocking may require re-enerva-
tion of the machine before safe removal.
5.
Notify affected personnel that the servicing or maintenance is completed and the machine
or equipment is ready for use.
PROCEDURE INVOLVING MORE THAN ONE PERSON
In the preceding steps, if more than one individual is required to lock out the Planer,
each
shall place his own personal lock on the energy isolating devices.
Summary of Contents for SlabMizer MB200
Page 1: ...MB200 Operations Manual...
Page 9: ...Specifications MB200 Dimensions 1 1 6 WMdoc082019 MB200 Dimensions...
Page 31: ...Planer Assembly Install the Feed Chain 3 3 10 WMdoc082019 Planer Assembly...
Page 38: ...Planer Setup Sanding Head 4 4 7 WMdoc082019 Planer Setup...
Page 55: ...Planer Alignment Dust Head 8 8 5 WMdoc082019 Planer Alignment...