![Wood-mizer SlabMizer MB200 Operation Manual Download Page 18](http://html1.mh-extra.com/html/wood-mizer/slabmizer-mb200/slabmizer-mb200_operation-manual_994588018.webp)
Electrical Lockout Procedures
WMdoc082019
2-5
2
2.3
Electrical Lockout Procedures
RULES FOR USING LOCKOUT PROCEDURE
The Planer shall be locked out to protect against accidental or inadvertent operation
when such operation could cause injury to personnel. Do not attempt to operate any
switch or valve bearing a lock.
LOCKOUT PROCEDURES MUST BE USED DURING:
MAINTENANCE HAZARDS INCLUDE:
FAILURE TO LOCKOUT MAY RESULT IN:
TO CONTROL MAINTENANCE DANGERS:
Lockout procedures must be followed (see OSHA regulation 1910.147).
Never rely on machine stop control for maintenance safety (emergency stops, on/off
buttons, interlocks).
Do not reach into moving cutters or feed systems. Allow all coasting parts to come
to a complete stop.
Electrical power supply and air supply must both be locked out.
Changing or adjusting cutters
Electrical maintenance
Unjamming operations
Retrieval of tools/parts from work area
Cleaning
Activities where guards or electrical
panel guard is open or removed
Mechanical repair
cutter contact
Missiles (thrown cutters/wood chips)
Pinch points
Electrical
Kickbacks
Cut
Serious injury and death
Crush
Amputation
Blindness
Burn
Puncture
Shock
Electrocution
Summary of Contents for SlabMizer MB200
Page 1: ...MB200 Operations Manual...
Page 9: ...Specifications MB200 Dimensions 1 1 6 WMdoc082019 MB200 Dimensions...
Page 31: ...Planer Assembly Install the Feed Chain 3 3 10 WMdoc082019 Planer Assembly...
Page 38: ...Planer Setup Sanding Head 4 4 7 WMdoc082019 Planer Setup...
Page 55: ...Planer Alignment Dust Head 8 8 5 WMdoc082019 Planer Alignment...