27. Cascade operation
Cascades (overpressure), open flue
The following basic principles are taken into
consideration in all calculations for the sizing
tables:
-
Length between the individual appliances: 1.0 m
-
Length after the last appliance: 2.0 m
-
Pressure drops: 2 x 45° bends in the diameter of
the header pipe (optionally as lateral offset or 90°
diversion)
-
Combustion air supply: from installation room
-
Duct ventilation: balanced flow principle
-
Geodetic height: 325 m
The following overview shows the maximum vertical flue length for open flue positive
pressure cascades, with different boiler combinations:
Flue system design
MGK-2
V
Nominal diameter
of connection line
to the appliance
S
Nominal
diameter of
header
A
Nominal
diameter of flue
pipe, vertical
Ø /
Minimum
duct sizes
H
Achievable
height from
duct inlet to
duct outlet
round
rectangular
390
2x row
DN250
DN250
DN315
420 mm
400 mm
50 m
3x row
DN250
DN315
DN315
420 mm
400 mm
42 m
4x row
DN250
*
*
*
*
*
470
2x row
DN250
DN250
DN315
420 mm
400 mm
50 m
3x row
DN250
DN315
DN315
420 mm
400 mm
17 m
4x row
DN250
*
*
*
*
*
550
2x row
DN250
DN250
DN315
420 mm
400 mm
22 m
DN250
DN315
DN315
420 mm
400 mm
50 m
3x row
DN250
*
*
*
*
*
4x row
DN250
*
*
*
*
*
630
2x row
DN250
DN315
DN315
420 mm
400 mm
23 m
3x row
DN250
*
*
*
*
*
4x row
DN250
*
*
*
*
*
* Calculation and design to EN 13384-2 – kit on request
A maximum back pressure up to 50 Pa must be maintained in the connection to the header line and must not be exceeded.
Only use DIBt approved flue pipes.
In cascade operation, a Wolf cascade controller is required.