Operating manual
Page 21 of 32
B0102
GMI / GML / SAB / GOI
6.5
Commissioning
The unit‘s functionality has been checked in the factory. Hence, it is ready for operation and
can be connected to a local voltage supply.
Important!
Note the safety instructions contained in the "Power supply and
switch-on" section.
First fill lubricant and then start the pump unit, in every case
(Minimum filling level, see chapter 7.2).
Commissioning procedure:
a) Filling the unit with lubricant
The units may be operated with clean oil or GML-A grease from original
packages only!
GMI-A, SAB-C, GOI-A:
Fill the lubricant into the reservoir through the filling hole.
Only GML-A:
Replacement of the cartridge:
Unscrew reservoir and pull back piston bar up to stop. Then insert both sides opened grease
cartridge into reservoir, and screw reservoir on. Screw reservoir on and push the piston bar
back in again completely.