
GMG-B Operation manual
Page 37 of 45
B0743
7.2 Refilling the reservoir
When operating the unit with oil, refill is to be made into the reservoir directly.
For operation with grease, it is recommended to refill through the filler connection by using a
filling pump, as such method ensures a refill that is widely free of air and contamination.
Important!
Versions without filling level monitoring require the checking of
the reservoir's filling level in regular intervals (intervals depend-
ing on consumption).
To ensure flawless functioning, the filling level must not be
lower than 10-15 mm above t
he reservoir’s bottom edge.
7.3 Switch-off
The unit is switched off by disconnecting it from the power supply.
The status of the last whole minute of the elapsed time will be stored.
min. filling level
Reservoir bottom edge
10
… 15 mm