
2
4300-00
60706-244
SAVE THESE INSTRUCTIONS
This manual contains important instructions
that should be followed during installation and
maintenance of the generator and batteries.
Read and understand all instructions in the manual
before starting and operating the generator set.
USING THIS MANUAL
Congratulations on your choice of a Winpower generator
set. You have selected a high-quality, precision-
engineered generator set designed and tested to give you
years of satisfactory standby service.
To get the best performance from your new engine
generator set, it is important that you carefully read and
follow the operating instructions in this manual.
Should you experience a problem please follow the
“Things To Check” near the end of this manual. The
warranty listed in this manual describes what you can
expect from WINPOWER should you need service
assistance in the future.
COPY YOUR MODEL AND SERIAL NUMBER
HERE
No other WINPOWER generator has the same serial
number as yours. It is important that you record the
number and other vital information here. If you should ever
need to contact us on this unit it will help us to respond to
your needs faster.
MODEL_____________________________________
SERIAL NUMBER____________________________
PURCHASE DATE____________________________
DEALER____________________________________
TABLE OF CONTENTS
INTRODUCTION
2
GUIDE TO PRODUCT SAFETY
3
BASIC INFORMATION
4
Description
4
DSE 7310 Engine Control
5
Specifi cation Table
5
PREPARING THE UNIT
Unpacking the unit
5
ENGINE GENERATOR INSTALLATION
Installation 6
Fuel Line Installation
6
Fuel
Pressure
Tables
7
LP Liquid Withdrawal
8
Lubrication
8
Coolant
8
Battery
Installation
8
Battery Charger/Block Heater Wiring
9
AC Electrical Connections
10
DC Electrical Connections
11
ENGINE CONTROL PANEL LAYOUT
12
DSE 7310 CONTROLLER
13
INITIAL START-UP
14
START-UP
PROCEDURE
14
EXERCISER CLOCK
15
TROUBLESHOOTING INFORMATION
15
CHANGING THE FUEL TYPE
16
GENERATOR END SPECIFICATION
16
ENGINE SPECIFICATIONS 17
ENGINE MAINTENANCE SCHEDULE
17
VOLTAGE REGULATOR WIRING 19
AC WIRING - THREE PHASE
277/480
Volt
20
120/208
Volt
20
120/240
Volt
21
AC WIRING - SINGLE PHASE
120/240
Volt
21
DC SCHEMATIC - WIRING DIAGRAM
22
WIRE SIZING TABLE
23
12 MONTH WARRANTY
24
PROPER USE AND INSTALLATION
You must be sure your new engine generator set is:
*
Properly serviced before starting
*
Operated in a well ventilated area
*
Properly exhausted and gases safely dispersed
*
Wired by a qualifi ed electrician
*
Operated only for its designed purposes
*
Used only by operators who understand its
operation
*
Properly maintained