UNPACKING INSTRUCTIONS:
When unpacking the generator set, be sure to inspect it carefully
for freight loss or damage. If loss or damage is noted at the time
of delivery, require that the person making the delivery make note
of the loss or damage on the freight bill, or affix his signature
under the consignee’s memo of the loss or damage. Contact the
carrier for claim procedures.
When loss or damage is noted after delivery, segregate the
damaged material, and contact the carrier for claim procedures.
“Concealed Damage” is understood to mean damage to the
contents of a package which is not in evidence at the time of
delivery by the carrier, but which is discovered later. The carrier
or carriers are responsible for merchandise lost or damaged
in transit. The title to goods rests with the consignee when
generators are shipped fob factory, and only the consignee can
legally file a claim.
***** CAUTION ****
EQUIPMENT DAMAGE -
These units are shipped with oil,
and a 50/50 mix of coolant. Be sure to check all fluid
levels before operating. See engine manufacturer’s
instruction manual for recommended oil requirements
before initial starting.
UNPACKING:
(Not recommended until the unit is on-site)
1. Carefully remove the crate.
2. After inspecting the engine-generator for external physical
damage, locate and check the following items packed with
the unit.
a. Owner’s operators manual.
b. Engine manufacturer’s instruction manual.
c. Battery hold-down brackets & hardware.
d. Unit components or accessory items shipped loose
for on-site installation.
e. Optional accessories.
3. Remove main frame hold down bolts.
4. Unit can now be lifted from shipping rails.
LIFTING THE GENERATOR SET
NOTICE - Personal Injury
To prevent injury to persons or equipment, observe the
following guidelines when lifting the generator:
Due to the different designs, configurations, options, weights,
site conditions, and available material handling equipment,
specific lifting instructions are not provided for each individual
generator set model. General guidelines provided are applicable
to the entire standby generator line. It is the responsibility of the
installing party to follow the lifting equipment’s operators manual
to prevent injury to personnel and damage to the generator.
Smaller Generator Sets may not require use of overhead lifting
equipment and may be placed on the pad with basic material
handling equipment, i.e. a forklift.
CAUTION
: - Do not attempt to lift the generator set by the means
of the lifting eyes on the engine or generator end.
These lifting points are only for use during the manufacturing
process and are designed for lifting of the individual Generator
Set component.
***************
***** WARNING ****
***************
NEVER - attempt to lift the fuel tank while filled with fuel.
Sloshing of the fuel can cause a shift in the balance of the
fuel tank, making for a DANGEROUS, unbalanced lifting load.
If the generator was shipped on the fuel tank, use the lifting
points located on the fuel tank to move the entire Generator
Set into place. DO NOT place fuel in the tank prior to lifting.
INSTALLATION
***************
***** WARNING ****
***************
PERSONAL INJURY - Before proceeding with the installation,
be sure the engine control is in the “stop” position. Before
proceeding with the installation, be sure the Generator MLCB
(Main Line Circuit Breaker) is in the ‘OFF’ position and the
unit starting battery is disconnected.
GENERAL INFORMATION
This series of engine/generator sets are designed and built as
open power units, meaning no weather protection has been
provided. These unit must be installed inside of an enclosure that
will provide proper protection from the elements.
Before beginning the installation process, recheck the voltage,
phase and amperage rating of the Generator Set. Be certain
it can handle the intended load and are compatible with the
intended loads. Plans for installation should be prepared with
proper attention to mechanical and electrical engineering detail
to assure a satisfactory system installation. The installation must
comply with all national, state, and local codes.
The information in this manual is offered only as a guide to
finalizing your installation plans.
NOTICE
For full service switching of the entire load, the ATS must be ‘SE’
(Service Entrance) rated or must have a properly rated fusible
disconnect installed before the ATS to protect the contacts
.
Summary of Contents for DE20I4
Page 10: ...60708 162 4094 00 CONTROL BOX AC WIRING...
Page 19: ...4094 00 60708 162 17 START CONTROL PANEL ENGINE WIRING HARNESS DE20 DE30 KEY START SCHMATIC...
Page 20: ...60708 162 4094 00 18 START CONTROL PANEL ENGINE WIRING HARNESS DE45 DE65 KEY START SCHMATIC...
Page 21: ...4094 00 60708 162 19 DE20 DE30 3110 ELECTRIC START PANEL LEFT BLANK INTENTIONALLY AT THIS TIME...
Page 22: ...60708 162 4094 00 20 86 85 30 87a 87 86 85 30 87a 87 DE45 DE65 DE90 3110 ELECTRIC START PANEL...
Page 23: ...4094 00 60708 162 21 THREE PHASE AC WIRING HIGH AND LOW WYE...
Page 24: ...60708 162 4094 00 22 THREE PHASE AC WIRING DELTA SINGLE PHASE AC WIRING...