SECTION 7 –
PLUMBING
7-16
Set Up Winterization Valves
2. Turn the Water Heater Bypass valve to
BYPASS position. (See “Water System Drain
Valve Locations” chart at the end of this
section for location on your model).
3. Install the Antifreeze Siphon Tube (located in
your InfoCase) onto the Winterization Port
(located near the sliding entrance door). Insert
the end of the siphon tube into a pail or other
container with 2 to 3 gallons of non-toxic RV
antifreeze solution.
4. Turn Winterization Valve 2 (located near the
sliding entrance door) to the “Winterize”
position.
NOTE: Ensure that all drain valves are
CLOSED before pumping RV antifreeze
into the water system.
Refer to the “Water System Drain Valve
Locations” chart at the end of this
section for valve locations on your
model.
Water Heater Bypass Valve
-Typical installation shown
(See “Water System Drain Valve Locations” chart
at the end of this section for location on your model)
Antifreeze Siphon Tube/Winterization Port
(Located near the sliding entrance door)
• Antifreeze Siphon Tube
• Winterization
Port
Winterization Valve 2
(Located near the sliding entrance door)