
31
2.
For the Installer
– Slide in the ash container – Fig. 71.
– Push the ash container slightly to the right and slide the handle all the way in – Fig. 72.
Fig. 71 Sliding in the ash container
Fig. 72 Pressing the container slightly to the
right and sliding the handle all the way in
– Install the hanger with the instructions folder and cleaning and operating implements on a wall in the boiler
room – Fig. 75.
Fig. 73 Closing the bracket fastener
Fig. 74 Closing the cladding door with the key
– Closing the bracket fastener – Fig. 73.
– Close left cladding door and turn key a quarter turn to the left to lock – Fig. 74.
Supplied as standard:
1 ........... Folder containing instructions
2 ........... Cleaning brush
3 ........... Spatula
4 ........... Key
5 ........... Down chute cleaning tool
6 ........... Hanger (for installation on the wall)
7 ........... Suction tube for cleaning the primary air tube
in the burner pot
Fig. 75 Mounting hanger with instructions folder,
cleaning and operating implements
1
2
3
4
5
6
7