Installation and operating instructions WILO Mather and Platt
–
MISO / PISO Pumps
4
Fig.4: Leveling of Base-plate [Page No.15, Point No. 7.2.2]
Fig.5:
Coupling
assembly
[Page
No.,
Point
No.
7.2.3]
Fig.5: Coupling Alignment [Page No.16, Point No. 7.2.3]
Fig.6: Forces and Moments [Page No.17, Point No. 7.2.4]