en
Safety
38
WILO SE 05
ƒ
Ground installation (underground): trained specialist in underground and pipeline
construction
Excavate and prepare the pit, backfill the pit, buoyancy safeguards, connection of
plastic pipes.
ƒ
Maintenance work: Skilled person (trained specialist in plant technology for sanitary
facilities)
Hazards caused by sewage, basic knowledge of lifting units, requirements EN 12056
ƒ
Lifting work: trained specialist for the operation of lifting devices
Lifting equipment, lifting gear, attachment points
ƒ
Personnel have been instructed on locally applicable regulations governing accident
prevention.
ƒ
Personnel have read and understood the installation and operating instructions.
2.3
Electrical connection
ƒ
Establish the electrical connection according to the instructions for the devices
used.
ƒ
Earth all electrical devices!
2.4
Monitoring devices
The pump chamber is used to collect sewage. In the event of a fault in the system, the
sewage can become backed up to the inlet. In serious cases, the pump chamber can
overflow.
The installation of a high water alarm is recommended to ensure operational reliability.
For increased safety, the high water alarm should be reported via GSM or fieldbus.
2.5
Explosive atmosphere in the col-
lection reservoir
Sewage containing faeces can lead to gas accumulations in the tank. These gas accu-
mulations can escape into the operating space and create an explosive atmosphere as a
result of incorrect installation or maintenance work. This atmosphere can ignite and
lead to an explosion. In order to prevent an explosive atmosphere, observe the follow-
ing points:
ƒ
Tank must be undamaged (no cracks, leaks, porous material)! Take any defective
lifting units out of operation.
ƒ
Ensure all connections for the inlet, pressure pipe and aeration and venting are
sealed tightly and in accordance with regulations!
ƒ
Guide the aeration and venting line over the roof.
ƒ
When opening the tank (e.g. during maintenance work), ensure appropriate ex-
change of air!
2.6
Transport
ƒ
Wear the following protective equipment:
–
Safety footwear
–
Hard hat
ƒ
Locally applicable laws and regulations on work safety and accident prevention must
be complied with.
ƒ
Demarcate and cordon off the working area.
ƒ
Keep unauthorised persons away from the working area.
ƒ
Remove loose components from the product.
ƒ
Only use legally prescribed and approved lifting and hoisting gear.
ƒ
Select the lifting gear based on the prevailing conditions (weather, attachment
point, load, etc.).
ƒ
Always attach the lifting gear to the attachment points.
ƒ
Ensure that the lifting gear is securely attached.
ƒ
Ensure that the hoisting gear is stable.
ƒ
Observe the swivel range.
ƒ
Ensure a second person is present to coordinate the procedure if required (e.g. if the
operator’s field of vision is blocked).
ƒ
Standing under suspended loads is not permitted. Do
not
move suspended loads
over workplaces where people are present.
2.7
Installing/dismantling
ƒ
Wear the following protective equipment:
–
Safety footwear
–
Safety gloves for protection against cuts
ƒ
Locally applicable laws and regulations on work safety and accident prevention must
be complied with.
ƒ
Demarcate and cordon off the working area.
ƒ
Remove objects lying around from the work area.
ƒ
Keep unauthorised persons away from the working area.
ƒ
If the weather conditions mean it is no longer possible to work safely, stop work.
Summary of Contents for DrainLift WS 40
Page 4: ......
Page 5: ...5 Deutsch 6 English 34 Français 62 Italiano 91 ...
Page 92: ...it 92 WILO SE 05 12 Smaltimento 118 12 1 Indumenti protettivi 119 ...
Page 120: ......
Page 121: ......
Page 122: ......