background image

Product description

en

Installation and operating instructions DrainLift S

9

3.1

Intended use

▪ For the backflow resistant drainage of discharge points for buildings below the back-

flow level

▪ Installation inside buildings (according to EN 12056 und DIN 1986‑100)
▪ Pumping sewage with and without faeces (according to EN 12050-1) out of the do-

mestic area in accordance with EN 12056-1

A grease trap must be installed for pumping greasy sewage!

Application limits

Improper use and overstraining will damage the reservoir. Strictly adhere to the applica-
tion limits:

▪ Max. intake/h: 600 l
▪ Max. positive suction head: 5 m
▪ Max. pressure in the pressure pipe: 1.5 bar
▪ Fluid temperature: 3...40 °C
▪ Ambient temperature: 3...40 °C

CAUTION
Overpressure in the collection reservoir!

Exceeding the application limits can result in overpressure in the collection reservoir.
This can cause the collection reservoir to burst! The application limits must be
strictly observed! The maximum possible intake must always be less than the
volume flow of the lifting unit at the respective duty point!

3.2

Improper use

DANGER
Explosion due to pumping of explosive fluids!

Pumping of highly flammable and explosive fluids (gasoline, kerosene, etc.) in pure
form is strictly prohibited. There is a risk of fatal injury due to explosion! The lifting
unit is not designed for these fluids.

The following fluids may 

not

 be introduced:

▪ Sewage from drainage objects that are located above the backflow level and can be

drained by natural fall (in accordance with EN 12056-1).

▪ Debris, ash, garbage, glass, sand, plaster, cement, lime, mortar, fibrous materials, tex-

tiles, paper towels, wet-wipes (e.g. fleece cloths, moist toilet paper wipes), nappies,
cardboard, coarse paper, synthetic resins, tar, kitchen waste, grease, oil

▪ Slaughterhouse waste, disposal of slaughtered animals and animal waste (liquid ma-

nure, etc.)

▪ Toxic, aggressive and corrosive media, such as heavy metals, biocides, pesticides, acids,

bases, salts, swimming-pool water (in Germany in accordance with DIN 1986-3)

▪ Cleaning agents, disinfectants, dishwashing or laundry detergents in excess amounts,

and such which have a high degree of foam formation

▪ Drinking water

Intended use also includes compliance with this manual. Any other use is regarded as
non-compliant with the intended use.

4

Product description

4.1

Design

Submersible, ready for connection and fully automatic sewage lifting unit as a single-
pump system for installation in buildings.

Summary of Contents for DrainLift S Series

Page 1: ...Pioneering for You DrainLift S 2544878 Ed 02 2017 06 en Installation and operating instructions...

Page 2: ......

Page 3: ...ct description 9 4 1 Design 9 4 2 Monitoring devices 10 4 3 Operating principle 10 4 4 Operating modes 10 4 5 Operation with frequency converter 11 4 6 Type key 11 4 7 Technical data 11 4 8 Scope of d...

Page 4: ...lities 23 9 3 Removal 23 9 4 Clean and disinfect 24 10 Maintenance and repair 24 10 1 Personnel qualifications 25 11 Spare parts 25 12 Disposal 25 12 1 Protective clothing 25 12 2 Information on the c...

Page 5: ...ithin the warranty period Application according to intended use All monitoring devices are connected and tested before commissioning Exclusion from liability Exclusion from liability excludes all liab...

Page 6: ...serious injuries CAUTION Failure to follow the instructions can lead to property damage and a possible total loss NOTE Useful information on handling the product Markups Prerequisite 1 Work step list...

Page 7: ...s and on the rating plate Earth the device Switchgears are to be arranged overflow proof Replace defective power supply cables immediately Contact customer service 2 4 Monitoring devices The following...

Page 8: ...ation Close the gate valve in the inlet and in the pressure pipe Provide adequate aeration in closed rooms When working in chambers and closed spaces a second person must be present for safety reasons...

Page 9: ...xplosive fluids Pumping of highly flammable and explosive fluids gasoline kerosene etc in pure form is strictly prohibited There is a risk of fatal injury due to explosion The lifting unit is not desi...

Page 10: ...nt for Pump OFF is defined by the set follow up time of the pump 4 1 4 Switchgear The lifting unit is controlled via the fitted switchgear The switchgear can also be used to implement a collective fau...

Page 11: ...ainLift Sewage lifting unit S Size 1 Single pump system 6 Maximum delivery head in m at Q 0 M Mains connection version M 1 230 V 50 Hz T 3 400 V 50 Hz RV Version with non return valve 4 7 Technical da...

Page 12: ...diately for defects damage completeness Defects must be noted on the freight documentation Furthermore de fects must be notified to the transport company or the manufacturer immediately on the day of...

Page 13: ...t store the lifting unit in rooms in which welding work is carried out The resulting gases or radiation can corrode the elastomer parts The lifting unit must be protected from direct sunlight and heat...

Page 14: ...te aeration of the operating space Ensure a clearance of min 60 cm around the system for maintenance work An additional pump sump in the operating space must be provided for draining large leakages mi...

Page 15: ...ng and pipe adaptors and designed according to the requirements Pressure resistance of pipework and pipe adaptors Tensile strength of the pipe adaptors longitudinal force fit connection The following...

Page 16: ...talled as a pipe loop The bottom edge of the pipe loop must be above the locally defined backflow level at its highest point Pressure pipe installed must be frost proof Install non return valve with v...

Page 17: ...information when connecting the inlet pipe The inlet must be within the marked areas If the inlet is outside the marked areas the following problems can occur Connection on the collection reservoir wi...

Page 18: ...n line over the roof Ensure all connections are completely tight Ventilation line is properly installed Installation materials available 1x pipe clamp 1 Open the connection port Pull the strip on the...

Page 19: ...d sewage must be regularly pumped into the pressure pipe For this purpose it is recommended to install a diaphragm hand pump between the lifting unit and the pressure pipe Fig 8 Optional Diaphragm han...

Page 20: ...chgear are shown in the circuit diagram in the appendix of these installation and operating instructions For further information on the individual functions observe the installation and operating inst...

Page 21: ...gate valve in the inlet The lifting unit should no longer switch on because no more fluid flows in If the lifting unit switches on again the non return valve is leaky For correct functioning of the n...

Page 22: ...accordance with local regulations Observe the specifications in the work regulations The operator must make sure that the personnel have received and read the work regulations 8 3 1 Overflow of the li...

Page 23: ...regulations for working with and under suspended loads must be observed 9 3 Removal DANGER Danger due to fluids hazardous to health during removal During removal contact with fluids that are hazardou...

Page 24: ...horing point 7 Pull the lifting unit carefully out of the pipework Lifting unit is dismantled Clean and disinfect the lifting unit and operating space 9 4 Clean and disinfect DANGER Danger due to flui...

Page 25: ...ustomer service To avoid return queries and incorrect or ders the serial or article number must always be supplied Subject to change without prior notice 12 Disposal 12 1 Protective clothing Used prot...

Page 26: ...0Hz 1 brown yellow green white grey blue brown black 2 3 4 5 L1 L2 L3 PE 3 400V 50 60Hz L1 L L2 N PE 1 230V 50 60Hz 1 230V 50Hz 30 15 0 Seconds ON 100 K DIP 1 2 3 4 5 6 7 PE SSM 1 2 3 7 8 9 4 5 6 GL W...

Page 27: ......

Page 28: ...Pioneering for You WILO SE Nortkirchenstr 100 44263 Dortmund Germany T 49 0 231 4102 0 T 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: