Operation

en

Installation and operating instructions DrainLift S

21

The lifting unit is operated via the fitted switchgear. The switchgear is preset for oper-
ating the lifting unit. For information on operating the switchgear and the individual
displays, the installation and operating instructions for the switchgear must be ob-
served.

7.4

Application limits

Improper use and overstraining will damage the reservoir. Strictly adhere to the applica-
tion limits:

▪ Max. intake/h: 600 l
▪ Max. positive suction head: 5 m
▪ Max. pressure in the pressure pipe: 1.5 bar
▪ Fluid temperature: 3...40 °C
▪ Ambient temperature: 3...40 °C

7.5

Test run

Before the lifting unit goes into automatic mode, carry out a test run. During a test run,
the proper function and the impermeability of the system are checked. It might be ne-
cessary to adjust the pump’s follow-up time to guarantee optimum operation of the
unit.

Lifting unit installed.

Installation checked for correct execution.

1. Switch on the lifting unit: Insert plug into socket.

2. Check operating mode of the switchgear.

⇒ The switchgear must operate in automatic mode.

3. Open the shut-off device on the inlet and pressure sides.

⇒ Collection reservoir is filled slowly.

4. Lifting unit is switched on and off using the level control.

⇒ In a test run, run through a complete pumping procedure of every pump.

5. Close the gate valve in the inlet.

⇒ The lifting unit should no longer switch on because no more fluid flows in. If

the lifting unit switches on again, the non-return valve is leaky. For correct
functioning of the non-return valve, check the position of the venting screw
on the non-return valve and correct if necessary!

6. Check to ensure that all pipe adaptors and the collection reservoir do not leak.

⇒ If all the components are leak-tight and the non-return valve closes correctly,

the lifting unit can run in automatic mode.

7. Open the gate valve in the inlet again.

▶ Lifting unit operates in automatic mode.

7.6

Adjusting the follow-up time

The pump run-time is set at the factory. If longer slurping noises can be heard (> 1 s) at
the end of the pumping process, reduce the follow-up time on the switchgear. For set-
ting the follow-up time, observe the installation and operating instructions for the fit-
ted switchgear!

NOTICE! If the follow-up time is adjusted, observe the operating mode of the lifting
unit. The operating mode specifies the max. permissible operating period!

8

Operation

8.1

Automatic mode

The lifting unit operates in automatic mode by default and is switched on and off using
the integrated level control device.

WARNING
Risk of burns from hot surfaces!

Motor housing can become hot during operation. It may cause burns. Allow the mo-
tor to cool down at ambient temperature after switching it off!

Commissioning was carried out.

Test run has been completed successfully.

The operation and functioning of the lifting unit are known.

Summary of Contents for DrainLift S Series

Page 1: ...Pioneering for You DrainLift S 2544878 Ed 02 2017 06 en Installation and operating instructions...

Page 2: ......

Page 3: ...ct description 9 4 1 Design 9 4 2 Monitoring devices 10 4 3 Operating principle 10 4 4 Operating modes 10 4 5 Operation with frequency converter 11 4 6 Type key 11 4 7 Technical data 11 4 8 Scope of d...

Page 4: ...lities 23 9 3 Removal 23 9 4 Clean and disinfect 24 10 Maintenance and repair 24 10 1 Personnel qualifications 25 11 Spare parts 25 12 Disposal 25 12 1 Protective clothing 25 12 2 Information on the c...

Page 5: ...ithin the warranty period Application according to intended use All monitoring devices are connected and tested before commissioning Exclusion from liability Exclusion from liability excludes all liab...

Page 6: ...serious injuries CAUTION Failure to follow the instructions can lead to property damage and a possible total loss NOTE Useful information on handling the product Markups Prerequisite 1 Work step list...

Page 7: ...s and on the rating plate Earth the device Switchgears are to be arranged overflow proof Replace defective power supply cables immediately Contact customer service 2 4 Monitoring devices The following...

Page 8: ...ation Close the gate valve in the inlet and in the pressure pipe Provide adequate aeration in closed rooms When working in chambers and closed spaces a second person must be present for safety reasons...

Page 9: ...xplosive fluids Pumping of highly flammable and explosive fluids gasoline kerosene etc in pure form is strictly prohibited There is a risk of fatal injury due to explosion The lifting unit is not desi...

Page 10: ...nt for Pump OFF is defined by the set follow up time of the pump 4 1 4 Switchgear The lifting unit is controlled via the fitted switchgear The switchgear can also be used to implement a collective fau...

Page 11: ...ainLift Sewage lifting unit S Size 1 Single pump system 6 Maximum delivery head in m at Q 0 M Mains connection version M 1 230 V 50 Hz T 3 400 V 50 Hz RV Version with non return valve 4 7 Technical da...

Page 12: ...diately for defects damage completeness Defects must be noted on the freight documentation Furthermore de fects must be notified to the transport company or the manufacturer immediately on the day of...

Page 13: ...t store the lifting unit in rooms in which welding work is carried out The resulting gases or radiation can corrode the elastomer parts The lifting unit must be protected from direct sunlight and heat...

Page 14: ...te aeration of the operating space Ensure a clearance of min 60 cm around the system for maintenance work An additional pump sump in the operating space must be provided for draining large leakages mi...

Page 15: ...ng and pipe adaptors and designed according to the requirements Pressure resistance of pipework and pipe adaptors Tensile strength of the pipe adaptors longitudinal force fit connection The following...

Page 16: ...talled as a pipe loop The bottom edge of the pipe loop must be above the locally defined backflow level at its highest point Pressure pipe installed must be frost proof Install non return valve with v...

Page 17: ...information when connecting the inlet pipe The inlet must be within the marked areas If the inlet is outside the marked areas the following problems can occur Connection on the collection reservoir wi...

Page 18: ...n line over the roof Ensure all connections are completely tight Ventilation line is properly installed Installation materials available 1x pipe clamp 1 Open the connection port Pull the strip on the...

Page 19: ...d sewage must be regularly pumped into the pressure pipe For this purpose it is recommended to install a diaphragm hand pump between the lifting unit and the pressure pipe Fig 8 Optional Diaphragm han...

Page 20: ...chgear are shown in the circuit diagram in the appendix of these installation and operating instructions For further information on the individual functions observe the installation and operating inst...

Page 21: ...gate valve in the inlet The lifting unit should no longer switch on because no more fluid flows in If the lifting unit switches on again the non return valve is leaky For correct functioning of the n...

Page 22: ...accordance with local regulations Observe the specifications in the work regulations The operator must make sure that the personnel have received and read the work regulations 8 3 1 Overflow of the li...

Page 23: ...regulations for working with and under suspended loads must be observed 9 3 Removal DANGER Danger due to fluids hazardous to health during removal During removal contact with fluids that are hazardou...

Page 24: ...horing point 7 Pull the lifting unit carefully out of the pipework Lifting unit is dismantled Clean and disinfect the lifting unit and operating space 9 4 Clean and disinfect DANGER Danger due to flui...

Page 25: ...ustomer service To avoid return queries and incorrect or ders the serial or article number must always be supplied Subject to change without prior notice 12 Disposal 12 1 Protective clothing Used prot...

Page 26: ...0Hz 1 brown yellow green white grey blue brown black 2 3 4 5 L1 L2 L3 PE 3 400V 50 60Hz L1 L L2 N PE 1 230V 50 60Hz 1 230V 50Hz 30 15 0 Seconds ON 100 K DIP 1 2 3 4 5 6 7 PE SSM 1 2 3 7 8 9 4 5 6 GL W...

Page 27: ......

Page 28: ...Pioneering for You WILO SE Nortkirchenstr 100 44263 Dortmund Germany T 49 0 231 4102 0 T 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: