Operation

22

WILO SE 2017-06

1. Switch on the lifting unit: Insert plug into socket.

2. Select automatic mode on the switchgear.

▶ The lifting unit operates in automatic mode and is controlled depending on level.

8.2

Manual operation

The lifting unit can also be switched on manually for a short test run or to drain the col-
lection reservoir manually in an emergency. For more information about manual opera-
tion, observe the installation and operating instructions for the switchgear.

The lifting unit is only approved for intermittent periodic duty. 

Continuous duty is not

permitted!

 The operating mode determines the max. operating time.

Comply with de-

tails on operating mode!

8.3

Emergency operation

DANGER
Danger due to fluids hazardous to health!

In emergency operation, contact with fluids that are hazardous to health may occur.
Observe the following points:

• Wear protective equipment:

⇒ Single-use body suit

⇒ Closed safety goggles

⇒ Mouth protection

• Used accessories (e.g. diaphragm hand pump, hoses) must be thoroughly

cleaned and disinfected after completing work.

• In case of flooding, disinfect the lifting unit and the operating space.

• Immediately wipe up drips.

• Flush rinsing water into the sewer system.

• Dispose of protective clothing and cleaning material in accordance with local

regulations.

• Observe the specifications in the work regulations! The operator must make

sure that the personnel have received and read the work regulations!

8.3.1

Overflow of the lifting unit

The lifting unit is overflow-proof, and can continue to be operated even in a disaster
situation. Comply with the following limit values:

▪ Max. overflow height: 2 mWS
▪ Max. overflow time: 7 days

NOTICE
Operating the lifting unit in a disaster situation

The switchgear is not overflow-proof. To ensure operation of the lifting unit even in
the event of an overflow, install the electrical connections and the switchgear at a
suitably high level!

8.3.2

Failure of the level control

If the level control fails, drain the collection reservoir in manual operation. For more in-
formation about manual operation, observe the installation and operating instructions
for the switchgear.

The lifting unit is only approved for intermittent periodic duty. 

Continuous duty is not

permitted!

 The operating mode determines the max. operating time.

Comply with de-

tails on operating mode!

8.3.3

Failure of the lifting unit

If the lifting unit completely fails, the sewage can be pumped out using the diaphragm
hand pump.

1. Close the gate valve in the inlet.

2. Close the gate valve in the pressure pipe.

3. Install the diaphragm hand pump on the lifting unit and the pressure pipe.

NOTICE! For connecting the diaphragm hand pump, the manufacturer’s instruc-
tions must be observed!

Summary of Contents for DrainLift S Series

Page 1: ...Pioneering for You DrainLift S 2544878 Ed 02 2017 06 en Installation and operating instructions...

Page 2: ......

Page 3: ...ct description 9 4 1 Design 9 4 2 Monitoring devices 10 4 3 Operating principle 10 4 4 Operating modes 10 4 5 Operation with frequency converter 11 4 6 Type key 11 4 7 Technical data 11 4 8 Scope of d...

Page 4: ...lities 23 9 3 Removal 23 9 4 Clean and disinfect 24 10 Maintenance and repair 24 10 1 Personnel qualifications 25 11 Spare parts 25 12 Disposal 25 12 1 Protective clothing 25 12 2 Information on the c...

Page 5: ...ithin the warranty period Application according to intended use All monitoring devices are connected and tested before commissioning Exclusion from liability Exclusion from liability excludes all liab...

Page 6: ...serious injuries CAUTION Failure to follow the instructions can lead to property damage and a possible total loss NOTE Useful information on handling the product Markups Prerequisite 1 Work step list...

Page 7: ...s and on the rating plate Earth the device Switchgears are to be arranged overflow proof Replace defective power supply cables immediately Contact customer service 2 4 Monitoring devices The following...

Page 8: ...ation Close the gate valve in the inlet and in the pressure pipe Provide adequate aeration in closed rooms When working in chambers and closed spaces a second person must be present for safety reasons...

Page 9: ...xplosive fluids Pumping of highly flammable and explosive fluids gasoline kerosene etc in pure form is strictly prohibited There is a risk of fatal injury due to explosion The lifting unit is not desi...

Page 10: ...nt for Pump OFF is defined by the set follow up time of the pump 4 1 4 Switchgear The lifting unit is controlled via the fitted switchgear The switchgear can also be used to implement a collective fau...

Page 11: ...ainLift Sewage lifting unit S Size 1 Single pump system 6 Maximum delivery head in m at Q 0 M Mains connection version M 1 230 V 50 Hz T 3 400 V 50 Hz RV Version with non return valve 4 7 Technical da...

Page 12: ...diately for defects damage completeness Defects must be noted on the freight documentation Furthermore de fects must be notified to the transport company or the manufacturer immediately on the day of...

Page 13: ...t store the lifting unit in rooms in which welding work is carried out The resulting gases or radiation can corrode the elastomer parts The lifting unit must be protected from direct sunlight and heat...

Page 14: ...te aeration of the operating space Ensure a clearance of min 60 cm around the system for maintenance work An additional pump sump in the operating space must be provided for draining large leakages mi...

Page 15: ...ng and pipe adaptors and designed according to the requirements Pressure resistance of pipework and pipe adaptors Tensile strength of the pipe adaptors longitudinal force fit connection The following...

Page 16: ...talled as a pipe loop The bottom edge of the pipe loop must be above the locally defined backflow level at its highest point Pressure pipe installed must be frost proof Install non return valve with v...

Page 17: ...information when connecting the inlet pipe The inlet must be within the marked areas If the inlet is outside the marked areas the following problems can occur Connection on the collection reservoir wi...

Page 18: ...n line over the roof Ensure all connections are completely tight Ventilation line is properly installed Installation materials available 1x pipe clamp 1 Open the connection port Pull the strip on the...

Page 19: ...d sewage must be regularly pumped into the pressure pipe For this purpose it is recommended to install a diaphragm hand pump between the lifting unit and the pressure pipe Fig 8 Optional Diaphragm han...

Page 20: ...chgear are shown in the circuit diagram in the appendix of these installation and operating instructions For further information on the individual functions observe the installation and operating inst...

Page 21: ...gate valve in the inlet The lifting unit should no longer switch on because no more fluid flows in If the lifting unit switches on again the non return valve is leaky For correct functioning of the n...

Page 22: ...accordance with local regulations Observe the specifications in the work regulations The operator must make sure that the personnel have received and read the work regulations 8 3 1 Overflow of the li...

Page 23: ...regulations for working with and under suspended loads must be observed 9 3 Removal DANGER Danger due to fluids hazardous to health during removal During removal contact with fluids that are hazardou...

Page 24: ...horing point 7 Pull the lifting unit carefully out of the pipework Lifting unit is dismantled Clean and disinfect the lifting unit and operating space 9 4 Clean and disinfect DANGER Danger due to flui...

Page 25: ...ustomer service To avoid return queries and incorrect or ders the serial or article number must always be supplied Subject to change without prior notice 12 Disposal 12 1 Protective clothing Used prot...

Page 26: ...0Hz 1 brown yellow green white grey blue brown black 2 3 4 5 L1 L2 L3 PE 3 400V 50 60Hz L1 L L2 N PE 1 230V 50 60Hz 1 230V 50Hz 30 15 0 Seconds ON 100 K DIP 1 2 3 4 5 6 7 PE SSM 1 2 3 7 8 9 4 5 6 GL W...

Page 27: ......

Page 28: ...Pioneering for You WILO SE Nortkirchenstr 100 44263 Dortmund Germany T 49 0 231 4102 0 T 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: