1
MULLION EVAPORATOR DESIGN
12 cu. ft. Top-Mount
Section One
Mullion Evaporator Design
12 cu. ft. Top-Mount
It is critical that the refrigerator/freezer be properly leveled. Both the back and front of the unit should
be carefully leveled before it is turned on.
1. Place a board across the rear of the installed position and set a level on the board.
(Fig. 2)
2. Place shims where the rear rollers will sit to level the board.
3. Remove the board and leave the shims in place.
4. Place the unit in its installed position.
Leveling the Refrigerator/Freezer
INSTALLATION CONSIDERATIONS
Measure the opening at the location in which the refrigerator/freezer is to be installed and make
sure the following minimum clearance dimensions are followed.
Top:
At least 3” (7.5cm) clearance between
the overhead cabinet and the refrigerator/
freezer top. (Dimension A)
(Fig. 1)
Sides: At least 1” (2.5cm) clearance on each side
of the refrigerator/freezer. (Dimension B)
(Fig. 1)
Back: At least ½” (1.25cm) clearance between
the condenser (“Old Design” 14 cu. ft.
Top-Mount) and the wall.
B
A
Fig 1
B
Fig. 2
Board
Level
Minimum Clearance
Summary of Contents for MID-LINE DESIGN
Page 6: ...VI NOTES ...
Page 18: ...12 MULLION EVAPORATOR DESIGN 12 cu ft Top Mount NOTES ...
Page 32: ...26 OLD DESIGN 12 14 cu ft Top Mount REFRIGERATOR LIGHT CIRCUIT MULLION HEATER CIRCUIT ...
Page 76: ...70 MID LINE DESIGN 16 thru 22 cu ft Top Mount NOTES ...
Page 107: ...VII ...
Page 108: ...VIII CORPORATION ...