Installation Manual: GT500 FRPP Supercharger System (750HP) (A1R2)
Last Updated: Aug 19
th
, 2010
Page 21 of 35
64.
Connect the BVES valve hard line to the aluminum chassis tube.
65.
Connect the supplied 3/8
”
hose from the nipple on the adapter housing to the nipple on the blower intake
housing.
Keep all hoses away from the exhaust manifold.
66.
Connect the quick connect fitting from the box located on the driver side inner fender to SC inlet quick connect
male fitting (top). Make sure it snaps/locks in place.