3.2
FOLDING THE TENT
NOTE:
TWO PEOPLE ARE REQUIRED FOR THIS OPERATION.
O -
After deflating the tubes, close the inflation valves and the protective flaps. The pressure relief valves must stay open.
P -
When deflating the arches, make sure that the arches at the end of the deflating procedure assume the longitudinal
position shown in figure 3.3.
Figure 3.3 - Arrangement of the arches inside the deflated tent.
Q -
Remove the three spacers from the sunshade as shown in paragraph 2.3 and place them in the bag.
R -
Spread the tent pulling the four eyelets in the corners of the base footprint.
S -
Roll up the guy lines and bind them so that they will not come loose, then start folding the tent.
T -
Go to the sides of the tent at lift the edges to fold over the middle line of the footprint (fig. 3.4).
Figure 3.4 - First fold (right-hand side).
U -
Repeat the operation on the other long side of the tent. The two folds may be perfectly overlapped (fig. 3.5).
Summary of Contents for AIRFRAME SENTINEL II
Page 1: ...Inflatable Shelter TECHNICAL MANUAL HEAVY DUTY INFLATABLE SHELTER SYSTEM P N SW SII 2015...
Page 2: ...D P...
Page 8: ...ILLUSTRATED PROCEDURE FOR SHELTER DEPLOYMENT...
Page 9: ......
Page 10: ......
Page 12: ...ILLUSTRATED PROCEDUREFOR SHELTER INFLATION...
Page 15: ...1 2 3 4 Figure 2 10 Assembly sequence of inner insulating liner for TAG NG 4 arches tent...
Page 17: ...Figure 2 12 Installed sunshade diagram Figure 2 13 Noose and knot on guy rod diagram at...