FIGURES
Figure
Page
1.1
SW-SII tent diagram
1-1
1.2
Checklist
1-2
2.1
Inflation valve closing
2-1
2.2
Simultaneous inflation kit diagram
2-5
2.3
Connecting the tube to the inflator
2-5
2.4
Pressing the tube into the inflation valve.
2-5
2.5
Unblocking spacer rod (Purlin) clamp
2-7
2.6
Spacer rod (Purlin) engagement by means of union joint
2-7
2.7
Spacer rod (Purlin) installed
2-7
2.8
Stake and guy line arrangement for SW-SII arches tent
2-7
2.9
Insulation liner diagram
2-8
2.10
Assembly sequence of inner insulating liner for SW-SII arches tent
2-9
2.11
Assembly sequence of the sunshade
2-10
2.12
Installed sunshade diagram
2-11
2.13
Noose and knot on guy rod diagram
2-11
2.14
Dust mat diagram
2-12
2.15
Electric system diagram
2-13
2.16
Switch on ceiling light
2-13
2.17
Air ventilation tube arrangement
2-14
2.18
Entrance module pole assembly diagram
2-15
2.19
Connecting corridor pole assembly diagram
2-16
2.20
Configurations of use of the window
2-17
3.1
Inflator tube engagement for deflation
3-1
3.2
Inflation valve tube pressure engagement
3-1
3.3
Arrangement of the arches inside the deflated tent
3-2
3.4
First fold (right-hand side)
3-2
3.5
Second fold (overlapping)
3-3
3.6
Rolling
3-3
3.7
Positioning in the bag
3-3
5.1
Repair kit contents table
5-1
5.2
Connection by means of wing bolt
5-2
5.3
Arch types
5-3
ILLUSTRATED PROCEDURES
ILLUSTRATED PROCEDURE FOR TENT DEPLOYMENT
from 2-2 to 2-4
ILLUSTRATED PROCEDURE FOR TENT ERECTION
2-6
Summary of Contents for AIRFRAME SENTINEL II
Page 1: ...Inflatable Shelter TECHNICAL MANUAL HEAVY DUTY INFLATABLE SHELTER SYSTEM P N SW SII 2015...
Page 2: ...D P...
Page 8: ...ILLUSTRATED PROCEDURE FOR SHELTER DEPLOYMENT...
Page 9: ......
Page 10: ......
Page 12: ...ILLUSTRATED PROCEDUREFOR SHELTER INFLATION...
Page 15: ...1 2 3 4 Figure 2 10 Assembly sequence of inner insulating liner for TAG NG 4 arches tent...
Page 17: ...Figure 2 12 Installed sunshade diagram Figure 2 13 Noose and knot on guy rod diagram at...