2.5
DUST MAT ASSEMBLY AND DISASSEMBLY
Take the four larger rolls inside the tent and unroll them. Arrange them starting from the two middle ones using the center
of the door as a reference. Arrange the other two external rolls under the base of the arches (refer to fig. 2.14).
Figure 2.14 - Dust mat diagram.
NOTE:
REVERSE THE PROCEDURE TO DISASSEMBLE. CLEAN THE MATS BEFORE PUTTING THEM BACK IN THE
PACKAGE.
2.6
ELECTRIC SYSTEM ASSEMBLY AND DISASSEMBLY
CAUTION!
DISCONNECT POWER FROM THE CONCERNED LIGHT BEFORE STARTING ANY OPERATION ON
ELECTRIC MATERIAL.
(THIS SECTION APPLIES TO EUROPEAN ELECTRIC SYSTEM, NOT US)
Install the electric system after assembling the tent. Refer to the diagram in figure 2.15 and to the following procedure:
A
- Position the distributor panel inside the tent on the opposite side of the alloy support. Apply the emergency light to the
tent poles using the plastic clips provided.
B -
Use the specific clips to fasten each ceiling light to the side spacer bars. It is advisable to start from the first ceiling light
near the distributor panel to avoid assembly mistakes.
C
- Connect the extension to the electric panel and connect the first ceiling light to the extension.
D
- Then connect the other lights in sequence. Use the extension to go from one side of the tent to the other. The last ceiling
light is the one without a socket.
E -
Apply the 16A distribution panel and night light on the right middle rod.
F -
Check correct connection of the parts by turning the switches on the electric panel to the off position, connecting to the
distribution network and then testing the installed line. Each ceiling light is provided with a switch (fig. 2.16). Make sure
that is it in the on position.
Summary of Contents for AIRFRAME SENTINEL II
Page 1: ...Inflatable Shelter TECHNICAL MANUAL HEAVY DUTY INFLATABLE SHELTER SYSTEM P N SW SII 2015...
Page 2: ...D P...
Page 8: ...ILLUSTRATED PROCEDURE FOR SHELTER DEPLOYMENT...
Page 9: ......
Page 10: ......
Page 12: ...ILLUSTRATED PROCEDUREFOR SHELTER INFLATION...
Page 15: ...1 2 3 4 Figure 2 10 Assembly sequence of inner insulating liner for TAG NG 4 arches tent...
Page 17: ...Figure 2 12 Installed sunshade diagram Figure 2 13 Noose and knot on guy rod diagram at...