33
instructions for the user
ENGLISH
6
Preparation of the machine
The preparation of the machine and the install-
ation operations must be carried out by qualified
personnel only.
The installer must strictly follow the indications
provided in chapter 5 "Warnings for the Installer".
6.1
Filling the water tank
•
Turn the key and open the door
(A)
;
•
fill the tank
(B)
with cold drinkable water;
•
close the door and
lock it.
6.2
Tank filter
If the water hardness
is more than 5°f , a BRITA
filter (supplied by de-
fault) should be installed
on the tank. Not only
does this filter reduce
limescale build-up, but
it also eliminates any
impurities and other substances such as chlorine
in the water.
Install the filter at the bottom of the tank accord-
ing to the manufacturer's instructions.
!
Using the machine without all the installation
operations having been carried out by technical
personnel could damage it seriously.
!
It is recommended to change the filter regularly,
depending on water consumption as per
machine warning, and no later than four months
since last replacement.
Refer to chapter 11 for warning and filter
replacement.
!
The machine must be placed in a perfectly
horizontal position.
!
It is recommended that you use potable water
and avoid using other liquids.
7
Machine start-up
7.1
Turning the machine on
•
Connect the machine to the power supply by
pugging the power cord;
•
Turn the switch ON
(9)
;
•
the automatic filling of water in the boiler and
the dispenser unit heating are activated when
the machine is switched on;
•
when the filling of water in the boiler has finished
the services boiler heating phase starts, indicated
by the sequential flashing of the LEDs of the keys;
•
wait for the coffee machine to warm up com-
pletely, indicated by the lighting of the LEDs
(5)
.
The flashing boiler level LED
(10)
indicates:
- LED flashing slowly: boiler filling in
progress;
- LED on: proper boiler level;
- LED flashing fast: boiler filling time out
(time limit for the filling exceeded).
When the machine is ready for dispensing, all the
LEDs are steady-on.
Turn on the machine 15 minutes before use to
ensure optimum performance during operation!
A
B
9
10
5
Summary of Contents for LB 4200 CAFFE'-CAFFE'
Page 2: ......
Page 3: ......
Page 4: ...4 Italiano MACCHINA PER CAFF ESPRESSO Manuale d uso e manutenzione Istruzioni per l utente...
Page 25: ......
Page 26: ...26 English ESPRESSO COFFEE MACHINE Use and maintenance manual Instructions for the user...
Page 47: ......
Page 69: ......
Page 70: ...70 Deutsch ESPRESSOMASCHINE Bedienungs und Wartungsanleitung Anweisungen f r den Benutzer...
Page 91: ......
Page 113: ......
Page 114: ...114 Portugu s M QUINA PARA CAF EXPRESSO Manual de uso e manuten o Instru es para o usu rio...
Page 135: ......