102
USER MANUAL
–
WebdynSunPM
Version 2.05
préliminaire
Server 1 is called the main server, server 2 is a backup server.
The backup server is only used to backup configurations. The main server alone
manages configuration file synchronisation.
To check that the server configuration is correct, clicking the
“Connect” button is
recommended. A window showing the connection log is displayed showing all the files
exchanged between the concentrator and the remote server. Looking at the last line is a quick
way to see if the connection was successful or not.
The e
nding of an ongoing connection using the “Abort” button is not instant, the cut occurs
between two actions. If an action is in progress, it must first complete. Every line in the
connection log represents an action.
If there are errors, check all the server settings.
Schedules:
It is possible to configure a set of connection “Schedules” for each server
Connection log
window closure
Summary of Contents for WebdynSunPM
Page 1: ...WebdynSunPM Supervision gateway for photovoltaic installations USER MANUAL...
Page 9: ...9 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 1 Presentation...
Page 18: ...18 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 2 Installation and Maintenance...
Page 39: ...39 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 3 Configuration...
Page 124: ...124 USER MANUAL WebdynSunPM Version 2 05 pr liminaire factory Parameters none...
Page 125: ...125 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 4 Operation...
Page 145: ...145 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 5 Update...
Page 147: ...147 USER MANUAL WebdynSunPM Version 2 05 pr liminaire...
Page 148: ...148 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 6 Tools diagnostics...
Page 150: ...150 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 7 Support...
Page 152: ...152 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 8 FAQ...
Page 159: ...159 USER MANUAL WebdynSunPM Version 2 05 pr liminaire 9 APPENDICES...