Installation and electrical connection | 8
5111232A OI-II Webasto Next
13 / 23
8.5
LAN cable
For connecting the charging station to the network infrastruc-
ture at the installation location. The charging station can be
configured and controlled using this connection (prerequisite:
connection to the back end or to the local energy management
system). A CAT 7 network cable or higher is recommended. The
LAN cable must be passed through the left-hand opening in the
wall box in order to connect it to the LAN socket.
8.6
Active power increase
4
3
2
1
Fig. 9
The active power control as per the rules of VDE AR-4100
should be connected as follows:
The two cables from the ripple control receiver must be inserted
into this connector in positions 3 and 4 (see Fig. 9). The two
cables can be assigned to pos. 3 and 4 in any order. (max. cable
cross section 1.5 mm²).
8.7
DIP switch settings
DANGER
High voltages.
u
Danger of fatal electric shock.
u
Ensure safe isolation from the power supply.
DIP-switches configure the current setting of the charging sta-
tion.
DIP switches determine the maximum current. The current can
be adjusted in 1 A increments using the Charger Setup app up
to the maximum value that is configured by the DIP switch.
ON (1)
OFF (0)
Fig. 10
DIP switch left/ON = 1
DIP switch right/OFF = 0
DIP-switch factory setting:
D1
D2
D3
D4
D5
D6
Off
Off
Off
On
On
On
NOTE
Changes to the DIP switch settings become active after
restarting the charging station.
The DIP switches should be programmed in such a way that the
output power illustrated below for the single- and three-phase
charging operation can be set to the desired maximum current
(D1-D6).
D1
D2
D3
[A]
Description
0
0
0
32
Factory settings
0
0
1
10
0
1
0
13
0
1
1
16
1
0
0
20
1
0
1
25
1
1
0
8
1
1
1
0
Demo mode: charging not pos-
sible
D4
0=
no unbalance load limit for single-phase char-
ging.
1=
unbalance load limit at 16 A and D1-D3 > 20 A
(for CH and AT).
D5
0=
no unbalance load limit for single-phase char-
ging.
1=
unbalance load limit at 20 A and D1-D3 > 25 A
(for D).
D6
1=
TN/TT system.
0=
IT system (only single-phase connection pos-
sible).