Benchmark Platinum-Edge [II]: Operation-Service Manual
SECTION 4
– INITIAL START-UP
OMM-
0137_E • GF-211 • 12/13/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page
46
of
153
Figure 4-7: First Manual Combustion Calibration Screen
7. Connect the gas pressure manometer to the
upstream
side of the gas train’s SSOV, as
shown in Section 4.2.2 and connect the Combustion Analyzer and Multimeter, as shown in
Section 4.2.3, and ensure that the heating loop is capable of dissipating sufficient heat at
full fire.
8. Verify that the incoming gas pressure to the unit is within the allowable range (see the
Benchmark Pre-Installation Gas Supply Guide
(TAG-0047, GF-2030)).
9. Once you have completed the previous step, move the manometer (or use a secondary
one) to the
downstream
side of the SSOV and press
Next
to continue.
10. For the NOx requirement choose
None
.
Figure 4-8: Choose NOx Requirement
11. The main
Manual Combustion Calibration
screen appears. It provides two methods to
ramp the unit’s valve position up or down:
•
Method 1
: Toggle through the pre-set calibration points till you reach the desired
valve position, then press
Go
to go to that point (left image below).
•
Method 2
: Enable
Fine VP Step
, then manually press the
+
or
–
buttons once per
1% to bring the unit to the desired valve position (right image below).