108
|
217
Product Overview
Operation
Connecting the Supply Tank Fill Line
1
M
M
M
F
F
F
3
2
4
5
6
Use the illustration and instructions to install the
supply tank fill line. To connect to the apparatus
plumbing, refer to:
1 Connect the split CANbus cable to the CANbus
connector on the node controller.
2 Connect the male end on the split CANbus
cable to an upstream node controller, or to the
PDM control box—the discharge CANbus
connection.
Note:
Use a CANbus extension cable if
necessary.
3 Connect the female end on the CANbus splitter
cable to next downstream node controller, or to
a terminating resistor if this is the last
downstream node controller in the system.
Note:
Use a CANbus extension cable if
necessary.
4 Locally source a Deutsch DT06-2S connector
and an appropriate cable to connect apparatus
power to the node controller. Power the node
controller through a 10 A circuit breaker.
5 Connect the supply tank fill line to the
concentrate supply.
6 Install the check valve, then connect the supply
tank fill line to the apparatus plumbing.
I-2254 L-1222-4