background image

 

CUBE

 Manual 

                                                                        Page 54 – Revision 10‐8‐2018 

 

 

ENABLING HOT TANK  

 

During Initial Installation or anytime the unit loses power, you must follow the Hot Tank Enabling 
Procedure. 

 

CAUTION!  

NEVER TURN ON HEATER BEFORE FILLING HOT TANK.

   

Green 

Heater and Compressor Power

 

Switch must be in the O=OFF position while 

the hot tank is empty.  Damage could occur within one minute and the 
overload (high limit) will require manual reset if heater is turned on with an 
empty Hot Tank.  

 

26.

 

Connect Cube Water Treatment System to power. 
 

27.

 

Turn the Red Power Switch on back of CUBE Water Treatment System.  I=ON 
 

28.

 

Ensure green heater / compression switch is in the O=OFF.   

 

CAUTION!  

NEVER TURN ON HEATER BEFORE FILLING HOT TANK.

   

Green 

Heater and Compressor Power

 

Switch must be in the O=OFF position while the hot tank is empty.  

Damage could occur within one minute and the overload (high limit) will require manual reset if 
heater is turned on with an empty Hot Tank.  

 

29.

 

Press the Hot Select Icon for 2 seconds until it illuminates. 

 

30.

 

Press the Dispense Button continuously for a minimum of 10 seconds.  The dispense backlight will 
turn Red Indicating Hot Water. 
 

31.

 

Continue to dispense until water comes out the faucet to ensure the Hot Tank is full before turning 
on the heater circuit. 
 

32.

 

Turn on the Green Heater/Compressor switch.  I = ON.  This ensures the Hot 
Water is full of water before the Heat Circuit will enable. 

 

 

 

Summary of Contents for CUBE

Page 1: ...ypochlorite or Citric Acid Based Cleaner Plastic Tubing at least 4 feet in length and assorted quick connect fittings TDS Meter and Test Strips for measuring chlorine Optional 1 8 NPT Female Thread to...

Page 2: ...ts of each chemical product Take all necessary precautions to prevent sanitizer from contacting eyes clothing and any other surfaces in could damage carpets 3 Remove the two screws at the rear of the...

Page 3: ...cure with two screws holding Top Cover in place 14 Connect 40 60 psi regulated potable water supply to the water inlet bulkhead fitting located on the back of the Cube Water Treatment System Turn on w...

Page 4: ...h 10 liters of cold water and 4 liters of ambient water through the machine to dilute and remove the sanitizer from the cold circuit You can use chlorine test strips to evaluate the water 19 Once the...

Page 5: ...green heater compression switch is in the O OFF CAUTION NEVER TURN ON HEATER BEFORE FILLING HOT TANK Green Heater and Compressor Power Switch must be in the O OFF position while the hot tank is empty...

Page 6: ...an cause severe burns or scalding Hot water should be dispensed carefully into insulated container to avoid injury Disable Cold and Hot Tanks 1 Turn off the Green Power Heater and Compressor Switch to...

Page 7: ...e above 97 F 3 6C or below 50 F 10 C Install indoors and keep unit away from excessive humidity Never expose to freezing temperatures Ensure there is adequate clearance around the unit to allow refrig...

Page 8: ...le tubing to the Reducer and the Water Supply Waterlogic requires the use of a water pressure regulator Water feed pressure must be between 40 60 psi 2 Turn on the water supply and check all of the co...

Page 9: ...tes Once a continuous flow is obtained flush 5 liters of water by continuing to hold the hot button Hot Tank is now full 10 Prime the Cold Circuit Holding a container under the dispensing faucet Selec...

Page 10: ...kin and eyes against ultraviolet rays Never look directly at an operating UV light Always disconnect before removal 16 Move the Waterlogic CUBE Water Treatment System into its final operating position...

Reviews: