
CUBE
Manual
Page 24 – Revision 10‐8‐2018
a.
Insert the Filter
Assembly back into
its cradle, aligning
the two male spigots
with the female holes
in the cradle
b.
Push it firmly until
the Filter is securely
in place and is flush
with the cradle top
surface.
c.
Lock the filter by
closing the locking
lever until it ‘clicks’
into place.
31.
Use a Phillips‐head screwdriver to reinstall the two screws at
the rear of the machine that secure the Top Cover if screws
were removed in Step 4.
32.
Turn on the water supply at the isolation point.
33.
Reconnect the power lead and insert it into the rear of the machine.
Turn on the Red Power Switch
I=ON
34.
The Green Heater/Compressor switch can now be turned on.
I=ON
Allow the
CUBE
to heat and cool the water.
35.
Clean the outside of the machine with the non‐abrasive anti‐bacterial wipe or cloth.
36.
Taste the water one final time, if you detect hint of taste, flush 3 more gallons of water
through the Hot Tank.