2. Directly plumbing unit into a production process 

The BlackMaxx™ RB8

 

RO is designed to run on a signal(s) from a level-sensing device(s). There 

are 2 inputs on the control board (120 VAC) that will start/stop the RO, on either low/high level. 

It can be configured to run in a process line, provided the unit will not be starting and stopping 

frequently.

 If the process requires the system to start more than 2 times per hour 

then a buffer 

tank, with a 20-minute minimum storage capacity, should be employed.  See next section. 

 

3. Using an atmospheric pressure (non-pressurized) storage tank and float switch

 

The BlackMaxx™ RB8

 

RO is designed to run on a signal from a level-sensing device(s) (120 VAC 

contact). The device is required to be

 normally open in the high-level (off) position

 to shut down 

the system in the Auto Run Mode. The level controls must be wired into the control box according to 

the supplied wiring diagram. 

NOTE: When the system is run in manual mode the level control 

device is by-passed.   

 

Ensure the storage tank selected is large enough to provide adequate water for your peak demand 

period.  Keep in mind that atmospheric water storage vessels are subject to contamination by 

airborne bacteria – they should include a lid, be sanitized before use and periodically disinfected. 

The RO product water will have no chlorine residual and will be subject to contamination at all stages 

in the plumbing system.  Consider inline UV disinfection, as an option for all water being pumped 

from the storage tank into the plumbing system if post-RO chemical disinfection is not being used. 

 

If the permeate is to remain in the tank for a period of more than 1 day without a disinfection residual 

being added, a recirculation loop with a UV disinfection or an in-tank UV unit  is recommended. 

Consult your Waterite dealer for UV system sizing. 

 

Ensure the permeate inlet fitting to a non-pressurized storage tank is placed above the maximum 

water level and overflow in the tank. This provides an air gap between the RO system and the stored 

permeate water. Should the stored water become contaminated for any reason, no cross 

contamination can occur back to the RB8 system.  

 

Consult your Waterite dealer for information and availability on a wide variety of water system 

components including storage tanks, rep-pressurization pumps, bulkheads, tube, pipe fittings, 

pressure switches, fittings, UV disinfection systems and float valves. 

 

 

Section 3. Installation 

 

INSPECT THE UNIT UPON ITS ARRIVAL FOR ANY DAMAGE THAT MAY HAVE OCCURRED 

DURING SHIPPING.   ALL RB8 UNITS ARE FACTORY TESTED FOR ELECTRICAL & SYSTEM 

INTEGRITY PRIOR TO SHIPPING. 

 

Your system includes: 

  The main RO/filter assembly frame comes fully assembled with pre-filter(s), booster pump, 

membrane housing(s), flow controls, pressure gauges, electrical cabinet, piping, actuated 

ball valves and flow meters.   

  2 to 24 membrane elements, depending on unit purchased, in a sealed plastic bag and 1-2 

or 5-micron polypropylene sediment cartridge; 

  One owner’s package including your owner’s Manual, warranty certificate,  and electrical 

drawings.

 All major components manufacturer manuals have been included with this 

RB8 operation manual in your package. Please take the time to familiarize yourself 

with the individual components prior to starting the system. 

 

Summary of Contents for BLACKMAXX RB8

Page 1: ...T FOR REFERENCE PURPOSES AND TECHNICAL GUIDANCE IT IS STRONGLY RECOMMENDED THAT QUALIFIED DEALER SERVICE PERSONNEL BE CONTACTED IN THE EVENT OF AN UNKNOWN INTERRUPTION OF SERVICE OR APPARENT PRODUCT M...

Page 2: ...molecules are allowed to pass through and collect in the tube while all other mineral and contaminant molecules are rejected and washed from the surface of the membrane to the drain Q What processes...

Page 3: ...low energy membrane s that are designed to operate at a minimum system pressure of 100 psi 7 0 kg cm and a maximum of 250 psi depending on the model 17 6kg cm Do not attempt to operate your system at...

Page 4: ...e are highly accurate instruments that have 4 20ma outputs for recording and alarm purposes Calibration of the sensors should be done twice a year Membrane cleaning is a site specific operation Depend...

Page 5: ...treated to levels 5 mg l to avoid membrane fouling This is usually achieved through the use of organic scavenging ion exchange resin polystyrene or polyacrylic regenerated with salt Chlorine Feed wat...

Page 6: ...requires The importance of feed water conditions is evident when you examine how crossflow membranes work In simple terms a crossflow filtration system separates an influent stream into two effluent s...

Page 7: ...ion rate Fouling of membrane surface Softener with organic scavenger resin A Series Fusion RS series Magnum Chlorine 1 ppm Permanent membrane damage Increased salt passage Carbon Filter CF Series Exce...

Page 8: ...3 3 M3 d RB840K 40000GPD 27 7 USGPM 104 4 LPM 1 6 L s 151 4 M3 d RB860K 60000GPD 41 5 USGPM 156 6 LPM 2 51L s 227 1 M3 d RB880K 80000GPD 55 4USGPM 209 LPM 3 3 L s 302 8 M3 d RB8100K 100000GPD 69 4 USG...

Page 9: ...RO chemical disinfection is not being used If the permeate is to remain in the tank for a period of more than 1 day without a disinfection residual being added a recirculation loop with a UV disinfec...

Page 10: ...requirements The RB8 system use a dual voltage configuration to minimize power consumption The system controls are run on a 120 vac 1 amp and the following are ratings for the motors at 230 208 vac 3...

Page 11: ...re 2b External Electrical Cabinet Motor power 3 PH disconnect Motor starter Flush valve relay Field connection terminals 120vac 24vdc Transformer Main control board 120vac 120 vac control power Manual...

Page 12: ...n and is capable of delivering the system s necessary feed water flow rate See below for specified feed water flow rate requirements 2 Turn the water supply line to your plumbing OFF Plumb a connectio...

Page 13: ...um flow requirements on full flow parameters Inlet feed rates will vary with projected system recovery rates Use the following formula to size flow rates according to your specifications Recovery Rate...

Page 14: ...permeate line should be used Hard plumbing is recommended with either a 304 316 Stainless Steel or PVC line DO NOT USE BLACK IRON PIPE TO CONNECT PERMEATE LINE OR FEEDWATER LINE TO SYSTEM Connect the...

Page 15: ...olution to sterilize them This can help to prevent any bacteria from contaminating the membranes product core See Figure 5 for membrane housing assembly Disconnect the power and turn off the feed wate...

Page 16: ...e lines Ensure the gaskets are in good repair Replace if necessary Turn power and water back on Start unit Fix any leaks 3 7 3 Membrane removal To remove the membrane from the housing remove the end c...

Page 17: ...point Allow the feed water to fill slowly into the system This process will expedite the air removal from the RO system Once the water starts to run out of the system to drain close the auto flush va...

Page 18: ...ce after about 48 to 72 hours of operation You should develop a daily log to track line pressure system pressure feed water TDS permeate TDS permeate flow rate and waste flow rate This will allow you...

Page 19: ...s kit This is needed to claim any parts or repair service during the warranty period Read the document completely for warranty claim instructions Your RB8 BlackMaxx system comes with a limited one yea...

Page 20: ...to tightening Replace gasket Threaded fittings leaking Disassemble remove old Teflon tape apply new tape re assemble Pre filter housing leaking Tighten clamp handle Remove cap and Inspect o rings for...

Page 21: ...nk full Drain Tank start in auto mode Low inlet pressure Check pre treatment system water quality Inlet valve closed System in alarm Check alarm status Pumps cavitating See low feed pressure System of...

Page 22: ...onductivity Probe ROSCOND VALVES Part Description Part 1 0 SS Globe Valve 20 30 40K AK200UJM100 1 25 SS Globe Valve 60 80K AK200UJM125 1 5 SS Globe Valve 100 120K AK200UJM150 1 00 Check Valve Poppet S...

Page 23: ...23 Section 9 RB8 BLACKMAXX Performance Log Date Feed System Permeate Feed Water Permeate Reject Permeate Waste Pressure Pressure TDS TDS Flow Meter Flow Meter Totalizer Totalizer...

Page 24: ...24 Date Feed System Permeate Feed Water Permeate Reject Permeate Waste Pressure Pressure TDS TDS Flow Meter Flow Meter Totalizer Totalizer...

Page 25: ...llowing is meant as a guide for determining the output of your BlackMaxx RB8 system Locate your model number and then look for the approximate temperature of your feed water This will give the estimat...

Page 26: ......

Reviews: