5
• The Parameter Display displays the current Cycle Step
(BW, BF, RR, etc) during regeneration, and the data
display counts down the time remaining for that cycle
step. While the valve is transferring to a new cycle step,
the display will flash. The parameter display will identify
the destination cycle step (BW, BF, RR, etc) and the data
display will read “----”. Once the valve reaches the cycle
step, the display will stop flashing and the data display will
change to the time remaining. During regeneration, the
user can force the control to advance to the next cycle
step immediately by pressing the extra cycle button.
Setting the Time of Day
1. Press and hold either the Up or Down buttons until the
programming icon replaces the service icon and the
parameter display reads TD.
2. Adjust the displayed time with the Up and Down buttons.
3. When the desired time is set, press the Extra Cycle
button to resume normal
operation. The unit will
also return to normal
operation after 5 seconds
if no buttons are pressed.
Queuing a Regeneration
1. Press the Extra Cycle button. The service icon will flash to
indicate that a regeneration is queued.
2. To cancel a queued regeneration, press the Extra Cycle
button.
Regenerating Immediately
Press and hold the Extra Cycle button for five seconds
Start-up Instructions
The water softener/filter should be installed with the inlet, outlet, and drain connections made in accordance with the
manufacturer’s recom
mendati
ons, and to meet applicable plumbing codes.
Please refer to the manual regeneration part of the timer operation section in this manual.
1. Position the valve to the brine / slow rinse position. Ensure the unit is drawing water from the brine tank (this step may
need to be repeated).
2. Position the valve to backwash. Ensure the drain line flow remains steady for 10 minutes or until the water runs clear
3. Position the valve to the rapid rinse position. Check the drain line flow, and run for 5 minutes or until the water runs clear.
4. Position the valve to the start of the brine tank fill cycle. Ensure water goes into the brine tank at the desired rate. The
brine valve drive cam will hold the valve in this position to fill the brine tank for the first regeneration.
5. Replace control box cover.
6. Put salt in the brine tank.
NOTE: Do not use granulated or rock salt.
Timer Features
Features of the SXT:
• Power backup that continues to keep time and the
passage of days for a minimum of 48 hours in the event of
power failure. During a power outage, the control goes
into a power-saving mode. It does not monitor water
usage during a power failure, but it does store the volume
remaining at the time of power failure.
• Settings for both valve (basic system) and control type
(method used to trigger a regeneration).
• Day-of-the-Week controls.
• While in service, the display alternates between time of
day, volume remaining or days to regeneration, and tank
in service (twin tank systems only).
• The Flow Indicator flashes when outlet flow is detected.
• The Service Icon flashes if a regeneration cycle has been
queued.
• A Regeneration can be triggered immediately by pressing
the Extra Cycle button for five seconds.
Summary of Contents for 6200 SXT
Page 1: ...6200 SXT Upflow Control Valve for Water Conditioning and Treatment Purposes Service Manual...
Page 21: ...Wiring Diagram 21...
Page 22: ...6200SXT Upflow Brining Rates 22 6200SXT Upflow Brining Rates with Water 20 PSI Regulated Cap...
Page 29: ...29 6200 SXT Valve Dimensional Drawings All dimensions are in Inches mm...
Page 35: ...35...