11 November 2020
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
…….
Copyright on all products and Specifications ©
8
HEAT SHIELD ASSEMBLY
Method:
If fitting fascia kit go to note ‘A’ on fascia kit as-
sembly before “Step 2”
Heat Shield Assembly : Step 1
Heat Shield Assembly: Step 2
Heat Shield Assembly: Step 3
Method:
1) Sit firebox into position and fix down. Assemble
adaptor and flue system according to AS/NZS
2918:2001.
2) Fix front panel on by insuring the location tag is posi-
tioned at the top of the side panels. Clamp, secure and
rivet front panel to side panels as shown.
OPTIONAL: If unable to rivet to the side
panel, screw front panel from front face.
Screws provided
.
Method:
Slide flue liner over flue and locate on spacer lugs .
Place top caps on the edge of the assembled sides,
clamp, secure and then rivet them together.
Heat Shield Check List
Packet Screws...Optional
1
Front Panel
2
Side panel LH
1
Side panel RH
1
Top Cap LH
1
Top Cap RH
1
Packed By
Plinth
Side Panel
Location Tag
Side Panel
Cap