background image

11 November 2020

 

Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.

 

All Dimension are in mm

……. 

Copyright on all products and Specifications © 

 

14

 

COMBUSTIBLE MANTLE CLEARANCES

 

HEARTH CLEARANCES

 

Note:

 

For Combustible Floors

 

Minimum Hearth of 

380mm  (A) must be 

maintained.

 

Mantle Clearances

 

 

 

Firebox

 

Y

 

Z

 

SI 780

 

1125

 

1230

 

SI 780T

 

1205

 

1230

 

SI 900

 

1275

 

1350

 

SI 1100

 

1325

 

1550

 

Note:

 

 

 

 

 

Twin Firebox mantle clearances,

 

same as corresponding firebox sizes

 

Summary of Contents for SI 1100 Twin

Page 1: ...mington Fire Installation The Warmington unit is to be Installed by a Certified Warmington Installer or an Approved NZHHA Installation Technician See www homeheat co nz members for a Certified NZHHA S...

Page 2: ...tem Care needs to be taken to ensure that the flue termination is in the correct position to maximise performance The Prevailing Wind Care needs to be taken to ensure that the flue termination is in t...

Page 3: ...350 350 425 450 Flue K 300 300 325 350 Flue Liner L 400 400 425 450 Fascia Width M 1040 1040 1160 1360 Fascia Height N 840 925 995 1045 Heat Output kW Peak 24 26 32 35 Range 15 17 17 19 18 21 19 22 E...

Page 4: ...hielding around the fire system This is a general installation guide only Contact a NZHHA Installer for Installation Advice or go to www homeheat co nz then select Members select your Region Installer...

Page 5: ...000 1100 1350 Heat Cell Clearance Depth P 680 680 830 880 Heat Cell Clearance Height Q 1700 1700 2400 2400 Hearth Width R 1200 1200 1350 1550 Hearth Projection S 600 600 600 600 Window Height V 825 90...

Page 6: ...1550 Hearth Projection S 600 600 600 600 Plinth Width T 1000 1000 1100 1350 Plinth Depth U 680 680 830 880 Centre of Flue J 350 350 425 450 Chimney Chase Clearance X 500 500 525 550 TIMBER PLAN FRONT...

Page 7: ...Width OO 1000 1000 1210 1210 Heat Cell Clearance Depth blockwork PP 680 680 830 880 Heat Cell Clearance Height QQ 1700 1700 2400 2400 Hearth Width RR 1200 1200 1350 1550 Hearth Projection SS 600 600...

Page 8: ...ix down Assemble adaptor and flue system according to AS NZS 2918 2001 2 Fix front panel on by insuring the location tag is posi tioned at the top of the side panels Clamp secure and rivet front panel...

Page 9: ...C Method Assemble together fascia side panels and top panel us ing fastenings pro vided Slide fascia down the front flange into position no less than 15mm overlap on each side Note 4 Fixing Fascia to...

Page 10: ...with ASNZS 2918 2001 4 9 1 1 NOTE The last length of flue pipe needs to extend past the liner so that when the top spider and the Flashing cone are fitted that the flashing cone and the flue pipe are...

Page 11: ...en flashing Butynol Dectite an Additional Flue pipe Baffle is required All external air vents ceiling penetrations must be bird proofed with permanently fixed screens All flashing to comply with E2 Te...

Page 12: ...and Specifications 12 SETTING ADD COWL AND FLASHING CONE HEIGHT CHIMNEY CHASE FLASHING AND AIR VENTILATION OPTIONS VENTING THROUGH CHIMNEY CHASE VENTING THROUGH FLASHING No Insulation under flashing...

Page 13: ...in mm Copyright on all products and Specifications 13 FLUE HEIGHT MINIMUM DETAILS FRAME OUT AND TRIM OUT DETAILS FOR CHIMNEY CHASE Option X Singled Lined Flue System Option Y Double Lined Flue System...

Page 14: ...mension are in mm Copyright on all products and Specifications 14 COMBUSTIBLE MANTLE CLEARANCES HEARTH CLEARANCES Note For Combustible Floors Minimum Hearth of 380mm A must be maintained Mantle Cleara...

Page 15: ...S WARNING ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4013 WARNING DO NOT USE FLAMMABLE LIQUIDS OR AEROSOLS TO ST...

Reviews: