29 March 2021
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
………….
Copyright ©
31
DIAGRAM B ( SHOWING CONTROL VALVE WITH TEST POINTS AND ADJUSTING SCREW )
•
After checking the pressure, turn the unit off, remove manometer from the test point and tighten the test
point screw. Ensure to check for gas leaks.
•
Ensure Power is off & reconnect Modulator Harness Connection in the main harness. See
Diagram B
above.
•
Turn the appliance on and off a few times to check ignition.
•
When you are satisfied that the appliance is working correctly, fit the front panel assembly back to the gas
burner.
•
NOTE:
Ensure you peel the Protective Plastic Coating from any stainless steel components if fitted.
•
All Burner aerations are Factory preset and cannot be adjusted.
•
If you are unable to get the unit to operate correctly, refer to troubleshooting before contacting your Local
Service Contact.
•
It may take approximately 2 hours of operation for the coals/logs or river rocks to achieve their full flame
pattern and glow.
•
During the Initial Burn period, some smoke and smell may be experienced. Because of this, run the ap-
pliance on the high position in a well ventilated room until the fumes dissipate .
DIAGRAM B
Modulator Harness
Connections
Modulator Harness Connections
Nut A
Screw B