![Warmhaus VIWA 115 Technical & Service Manual Download Page 52](http://html1.mh-extra.com/html/warmhaus/viwa-115/viwa-115_technical-and-service-manual_872639052.webp)
52
warmhaus.com.tr
13. A flue gas analysis must be carried out when completed. See. Chapter - Commissioning
8. After burner group is removed completely /examine the
exchanger (heat changer) assembly carefully.
9. Control the inner section of heat exchanger, if necessary,
clean it with a soft brush and vacuum cleaner.
10. Control the gaskets and isolation of the burner, if damaged,
change it
11. Control the position and condition of contact and ionized electrodes, change if necessary. (Distance between the electrode tips
must be 4mm)
12. Mount in the opposite order of removal when starting the installation.