
Page 71
Date of Installation:
Date of Commissioning:
1. Installation Engineer Details
5. Commissioning Engineer Details
MCS/SEAI Registration No.
MCS/SEAI Registration No.
Installation Company Name
Commissioning Company Name
Installation Company Address
Commissioning Company Address
Contact Telephone No.
Contact Telephone No.
Installer's Name
Commissioning Engineer's Name
Installer's E-Mail
Commissioning Engineer's E-Mail
2. Appliance Details
6. Commissioning Performance
Appliance Model No.
DHW Cylinder Heat Up Test
Max. DHW Temp Achieved
°C
Thermal Disinfection
Appliance Serial No.
Maximum Heating Flow Rate Achievable
l/min
3. Householder & Installation Address Details
7. Statement of Conformity
Householder's Name
Householder's Address
Installation Company Address
Contact Telephone No.
Houseolder's Email Address
4. System Details
Approximate Age of Dwelling
m
2
Notes:
Heating System Overview
Replacement
New
Heating System Type
Open Vented (Gravity)
Sealed (Pressurised)
Heat Emitters
Radiators
Underfloor
Competent Person's Signature
Print Name
Total Heating System Volume
Customer's Signature*
Print Name
Has the system been flushed
*To confirm demonstrations of the appliance and receipt of related appliance instructions
Corrosion Inhibitor Added
Brand
Notes:
Buffer tank volume (L)
1. An estimate of system performance should be detailed in a separate document within the Installer's Handover Pack.
DHW Cylinder Details
Brand
litres
2. The system requires regular maintenance as detailed in the Installer's Handover Pack & manufacturer's instructions.
3. A certificate confirming registration on the MCS Installation Database should be found in the Installer's Handover Pack.
Further Details of Heating System (no. of zones, underfloor pipe spacing, piep sizes etc.
Volume
Model
Quantity Added
What cleaner was used
Total Expansion Capacity
If no buffer min circulating vol (L)
8. Commissioning Completion
Post Code
Installation & Commissioning Certificate
PLEASE COMPLETE IN BLOCK CAPITALS
Floor Area
Does the installation conform to IEE Regulations, relevant British &
European standards, codes of practice, Duilding Regulations &
Local Authority Bylaws?
Has the customer been explained the correct operation of the
appliance according to the manufacturer's instructions?
Does the installation comply with the Manufacturer's instructions?
Has the manufacturer's maintenance instructions & schedules
been explained to the customer?
Does the installation conform to the requirements of MCS
Microgeneration Installation Standard MIS 3005?
Has the appliance warranty documentation been provided to
the customer?
Has the appliance operating manual been explained & provided to
the customer?
years
Summary of Contents for A Series
Page 36: ...Page 34 Figure 24 AS02 R32 Casing Dimensions Heating Connection Locations FRONT SIDE TOP...
Page 40: ...Page 38 Figure 26 Heating DHW Schematic Figure 27 Heating Only Schematic...
Page 70: ...Page 68 7 APPENDIX B WIRING DIAGRAMS...
Page 71: ...Page 69...
Page 72: ...Page 70 This page is intentionally left blank...
Page 74: ...Page 72 This page is intentionally left blank...
Page 76: ...Page 74...
Page 77: ...Page 75...
Page 78: ...Page 76...
Page 79: ...Page 77...
Page 80: ...Page 78...
Page 81: ...Page 79...
Page 82: ...Page 80...
Page 83: ...Page 81...
Page 84: ...Page 82...
Page 85: ...Page 83...
Page 86: ...Page 84...
Page 87: ...Page 85...
Page 88: ...Page 86...